0364261006000

Well Details

Well ID: 0364261006000
Loading map...
Location: 00/06-10-036-26W4/0
Location Alias: 00/06-10-36-26 W4M
Location Alias 2: 00/06-10-036-26 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 26
Section: 10
County/Municipality: Red Deer County
Well Name: PINE CLIFF THREEHCK 6-10-36-26
Operator Name: Pine Cliff Energy Ltd.
License Number: 0144910
License Date: 1990-07-26
License Status: RecCertified
Spud Date: 1990-08-07
Final Drill Date: 1990-08-15
Well Total Depth: 1615.00 m
Surface Hole Latitude: 52.074492
Surface Hole Longitude: -113.640065

For data sources see[1][2]

Well History

Date Event
1990-07-26 Obtained License
1990-08-08 Surface Casing Operation Performed
1990-08-12 Drill Stem Test Performed
1990-08-15 Finished Drilling
1990-08-15 Well Mode changed to Drilled and Cased
1990-08-16 Drill Stem Test Performed
1990-08-16 Well Log Performed
1990-08-18 Production Casing Operation Performed
1990-08-18 Rig Released
1990-09-02 Well Log Performed
1990-09-04 Perforation Treatment Performed - Jet Perforation
1990-09-07 Perforation Treatment Performed - Jet Perforation
1990-09-07 Well Log Performed
1990-09-10 Perforation Treatment Performed - Fractured
1990-10-11 Well Began Production
1990-10-11 Well Fluid changed to Crude Oil
1990-10-11 Well Mode changed to Flowing
1994-02-01 Well Fluid changed to Crude Oil
1994-02-01 Well Mode changed to Suspended
1994-07-28 Well Log Performed
1994-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-29 Plug Back Performed
1994-07-29 Well Fluid changed to Crude Oil
1994-07-29 Well Mode changed to Abandoned Zone
1998-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-04 Perforation Treatment Performed - Jet Perforation
1998-09-04 Plug Back Performed
1998-09-04 Well Log Performed
1998-09-08 Perforation Treatment Performed - Fractured
1998-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-01 Plug Back Performed
1999-12-04 Perforation Treatment Performed - Jet Perforation
1999-12-04 Perforation Treatment Performed - Remedial Casing
1999-12-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-09-04 Perforation 1567.50 1571.00 13
1998-10-01 Packing Device Capped w/Cement 848.00 856.00 0
1999-12-04 Perforation 235.00 235.50 13
1999-12-04 Remedial Casing Cementing 235.00 235.50 0
1990-09-07 Perforation 947.00 951.00 13
1990-09-07 Perforation 953.00 957.00 13
1990-09-10 Fracture 947.00 957.00 0
1994-07-29 Packing Device Capped w/Cement 1532.00 1540.00 0
1998-09-04 Packing Device Capped w/Cement 934.00 942.00 0
1998-09-04 Perforation 868.00 871.00 18
1998-09-04 Perforation 866.50 867.50 18
1998-09-08 Fracture 866.50 871.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1731 0.0 0.0 0.0
1991 8364 0.0 0.0 0.0
1992 8587 0.0 0.0 0.0
1993 2699 0.0 0.0 0.0

For data sources see[5]