If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364240514002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.069415,"lon":-113.39528,"icon":""}]} |
Location: 00/14-05-036-24W4/2 | |
Location Alias: 00/14-05-36-24 W4M | |
Location Alias 2: 00/14-05-036-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD HUXLEY 14-5-36-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412273 | |
License Date: 2009-09-11 | |
License Status: Amended | |
Spud Date: 2010-01-11 | |
Final Drill Date: 2010-01-14 | |
Well Total Depth: 1051.00 m | |
Surface Hole Latitude: 52.069415 | |
Surface Hole Longitude: -113.395280 |
Date | Event |
---|---|
2009-09-11 | Obtained License |
2010-01-11 | Direction Drilling Operation Performed - Deviate |
2010-01-11 | Surface Casing Operation Performed |
2010-01-14 | Direction Drilling Operation Performed - Sidetrack Fish |
2010-01-14 | Finished Drilling |
2010-01-14 | Well Mode changed to Drilled and Cased |
2010-01-15 | Production Casing Operation Performed |
2010-01-15 | Rig Released |
2010-01-21 | Well Log Performed |
2010-02-02 | Perforation Treatment Performed - Jet Perforation |
2010-02-07 | Perforation Treatment Performed - Jet Perforation |
2010-02-13 | Perforation Treatment Performed - Fractured |
2010-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-02-15 | Well Mode changed to Testing |
2010-03-06 | Well Began Production |
2010-03-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-03-06 | Well Mode changed to Flowing |
2010-03-22 | Well Log Performed |
2010-06-18 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-11 | 0.00 | Deviate (5 - 79 degrees) |
2010-01-14 | 235.70 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-02 | Perforation | 789.00 | 791.00 | 13 |
2010-02-07 | Perforation | 502.30 | 504.30 | 13 |
2010-02-07 | Perforation | 511.30 | 511.80 | 13 |
2010-02-07 | Perforation | 557.90 | 558.90 | 13 |
2010-02-07 | Perforation | 531.60 | 532.10 | 13 |
2010-02-07 | Perforation | 563.90 | 564.40 | 13 |
2010-02-07 | Perforation | 266.30 | 267.30 | 13 |
2010-02-07 | Perforation | 480.00 | 481.50 | 13 |
2010-02-07 | Perforation | 422.00 | 423.00 | 13 |
2010-02-07 | Perforation | 404.50 | 405.50 | 13 |
2010-02-07 | Perforation | 539.00 | 541.00 | 13 |
2010-02-02 | Perforation | 844.50 | 846.00 | 13 |
2010-02-07 | Perforation | 259.80 | 260.30 | 13 |
2010-02-07 | Perforation | 250.00 | 251.50 | 13 |
2010-02-07 | Perforation | 577.00 | 578.00 | 13 |
2010-02-07 | Perforation | 654.70 | 655.70 | 13 |
2010-02-07 | Perforation | 648.10 | 649.60 | 13 |
2010-02-07 | Perforation | 645.70 | 647.20 | 13 |
2010-02-07 | Perforation | 980.60 | 981.60 | 13 |
2010-02-07 | Perforation | 973.80 | 974.30 | 13 |
2010-02-07 | Perforation | 663.40 | 663.90 | 13 |
2010-02-07 | Perforation | 603.50 | 604.00 | 13 |
2010-02-02 | Perforation | 674.00 | 677.00 | 13 |
2010-02-07 | Perforation | 581.20 | 582.70 | 13 |
2010-02-07 | Perforation | 579.30 | 581.30 | 13 |
2010-02-07 | Perforation | 616.30 | 616.80 | 13 |
2010-02-07 | Perforation | 631.20 | 632.20 | 13 |
2010-02-07 | Perforation | 640.60 | 641.10 | 13 |
2010-02-13 | Fracture | 404.50 | 578.00 | 0 |
2010-02-13 | Fracture | 973.80 | 981.60 | 0 |
2010-02-13 | Fracture | 663.40 | 663.90 | 0 |
2010-02-13 | Fracture | 250.00 | 655.70 | 0 |
2010-02-13 | Fracture | 674.00 | 895.50 | 0 |
2010-02-02 | Perforation | 694.00 | 695.00 | 13 |
2010-02-02 | Perforation | 889.00 | 891.00 | 13 |
2010-02-02 | Perforation | 842.50 | 843.50 | 13 |
2010-02-02 | Perforation | 894.50 | 895.50 | 13 |
2010-02-07 | Perforation | 497.00 | 498.00 | 13 |
2010-02-07 | Perforation | 445.50 | 446.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7069 | 0.0 | 0.0 | 0.0 |
2011 | 8607 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8746 | 0.0 | 0.0 | 0.0 |
2014 | 8682 | 0.0 | 0.0 | 0.0 |
2015 | 8752 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]