X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364232807002

Well Details

Well ID: 0364232807002
Loading map...
Location: 00/07-28-036-23W4/2
Location Alias: 00/07-28-36-23 W4M
Location Alias 2: 00/07-28-036-23 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 28
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 7-28-36-23
Operator Name: Ember Resources Inc.
License Number: 0359770
License Date: 2006-07-04
License Status: Amended
Spud Date: 2006-07-28
Final Drill Date: 2006-08-02
Well Total Depth: 1217.00 m
Surface Hole Latitude: 52.124331
Surface Hole Longitude: -113.235951

For data sources see[1][2]

Well History

Date Event
2006-07-04 Obtained License
2006-07-28 Direction Drilling Operation Performed - Deviate
2006-07-28 Lost Circulation Occurred
2006-08-01 Surface Casing Operation Performed
2006-08-02 Finished Drilling
2006-08-02 Well Log Performed
2006-08-02 Well Mode changed to Drilled and Cased
2006-08-03 Production Casing Operation Performed
2006-08-03 Rig Released
2006-08-15 Well Log Performed
2006-10-14 Perforation Treatment Performed - Jet Perforation
2006-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-02 Perforation Treatment Performed - Jet Perforation
2006-11-02 Plug Back Performed
2006-11-04 Perforation Treatment Performed - Fractured
2006-11-13 Well Fluid changed to Coalbed Methane-Coals Only
2006-11-13 Well Mode changed to Testing
2007-10-26 Well Began Production
2007-10-26 Well Fluid changed to Coalbed Methane-Coals Only
2007-10-26 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-07-28 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-14 Perforation 1166.00 1167.00 20
2006-11-02 Perforation 662.10 665.10 13
2006-11-02 Perforation 644.60 645.60 13
2006-11-02 Perforation 643.50 644.50 13
2006-11-02 Perforation 641.70 642.70 13
2006-11-02 Perforation 638.20 639.20 13
2006-11-02 Perforation 632.80 633.80 13
2006-11-02 Perforation 624.90 625.90 13
2006-11-02 Perforation 608.40 609.40 13
2006-11-02 Perforation 592.80 593.80 13
2006-11-02 Perforation 572.60 573.60 13
2006-11-02 Packing Device Capped w/Cement 1155.00 1163.00 0
2006-11-02 Perforation 571.10 572.10 13
2006-11-02 Perforation 568.90 569.90 13
2006-11-02 Perforation 560.50 561.50 13
2006-11-02 Perforation 487.70 488.70 13
2006-11-04 Fracture 487.70 767.50 0
2006-11-02 Perforation 766.50 767.50 13
2006-11-02 Perforation 764.50 765.50 13
2006-11-02 Perforation 762.00 763.00 13
2006-11-02 Perforation 735.60 736.60 13
2006-11-02 Perforation 721.00 723.00 13
2006-11-02 Perforation 717.70 718.70 13
2006-11-02 Perforation 712.60 713.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 72 0.0 0.0 0.0
2007 1579 0.0 0.0 0.0
2008 8168 0.0 0.0 0.0
2009 8530 0.0 0.0 0.0
2010 8533 0.0 0.0 0.0
2011 8593 0.0 0.0 0.0
2012 8780 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8707 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-07-28 Lost Circulation 52.00 112.00

For data sources see[7]

References