X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364230407002

Well Details

Well ID: 0364230407002
Loading map...
Location: 00/07-04-036-23W4/2
Location Alias: 00/07-04-36-23 W4M
Location Alias 2: 00/07-04-036-23 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 04
County/Municipality: Red Deer County
Well Name: SOC MIKWAN 7-4-36-23
Operator Name: AlphaBow Energy Ltd.
License Number: 0153452
License Date: 1992-08-18
License Status: Issued
Spud Date: 1992-09-12
Final Drill Date: 1992-09-20
Well Total Depth: 1620.00 m
Surface Hole Latitude: 52.061045
Surface Hole Longitude: -113.227776

For data sources see[1][2]

Well History

Date Event
1992-08-18 Obtained License
1992-09-13 Surface Casing Operation Performed
1992-09-19 Lost Circulation Occurred
1992-09-20 Finished Drilling
1992-09-20 Well Mode changed to Drilled and Cased
1992-09-21 Drill Stem Test Performed
1992-09-21 Well Log Performed
1992-09-22 Drill Stem Test Performed
1992-09-24 Production Casing Operation Performed
1992-09-24 Rig Released
1992-09-29 Well Log Performed
1992-09-30 Perforation Treatment Performed - Jet Perforation
1992-09-30 Well Log Performed
1992-10-01 Well Log Performed
2000-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-11 Plug Back Performed
2000-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-12 Perforation Treatment Performed - Jet Perforation
2000-02-12 Well Log Performed
2000-02-14 Perforation Treatment Performed - Fractured
2000-02-14 Perforation Treatment Performed - Jet Perforation
2000-02-14 Well Log Performed
2000-02-21 Well Began Production
2000-02-21 Well Fluid changed to Gas
2000-02-21 Well Mode changed to Flowing
2014-01-01 Well Fluid changed to Gas
2014-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-09-30 Perforation 1567.50 1572.50 13
1992-09-30 Perforation 1573.50 1575.00 13
1992-09-30 Perforation 1575.50 1578.00 13
2000-02-11 Packing Device Capped w/Cement 1550.00 1558.00 0
2000-02-12 Perforation 1409.00 1411.00 20
2000-02-12 Acid Treatment 1409.00 1411.00 0
2000-02-14 Perforation 1409.00 1411.00 20
2000-02-14 Fracture 1409.00 1411.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 7502 0.0 0.0 0.0
2001 8754 0.0 0.0 0.0
2002 8710 0.0 0.0 0.0
2003 8694 0.0 0.0 0.0
2004 8743 0.0 0.0 0.0
2005 8382 0.0 0.0 0.0
2006 8501 0.0 0.0 0.0
2007 8153 0.0 0.0 0.0
2008 8303 0.0 0.0 0.0
2009 8517 0.0 0.0 0.0
2010 8671 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8399 0.0 0.0 0.0
2015 7658 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 3599 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-09-19 Lost Circulation 1534.00 1534.00

For data sources see[6]

References