If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364223508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.137078,"lon":-113.041924,"icon":""}]} |
Location: 00/08-35-036-22W4/0 | |
Location Alias: 00/08-35-36-22 W4M | |
Location Alias 2: 00/08-35-036-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 22 | |
Section: 35 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD MIKWAN 8-35-36-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0407316 | |
License Date: 2009-01-06 | |
License Status: Issued | |
Spud Date: 2009-02-23 | |
Final Drill Date: 2009-02-24 | |
Well Total Depth: 1048.00 m | |
Surface Hole Latitude: 52.137078 | |
Surface Hole Longitude: -113.041924 |
Date | Event |
---|---|
2009-01-06 | Obtained License |
2009-02-24 | Direction Drilling Operation Performed - Deviate |
2009-02-24 | Finished Drilling |
2009-02-24 | Surface Casing Operation Performed |
2009-02-24 | Well Mode changed to Drilled and Cased |
2009-02-25 | Production Casing Operation Performed |
2009-02-25 | Rig Released |
2009-03-07 | Well Log Performed |
2009-03-15 | Perforation Treatment Performed - Jet Perforation |
2009-03-15 | Well Log Performed |
2009-03-16 | Well Fluid changed to Gas |
2009-03-16 | Well Mode changed to Testing |
2009-03-17 | Perforation Treatment Performed - Fractured |
2009-03-25 | Well Began Production |
2009-03-25 | Well Fluid changed to Gas |
2009-03-25 | Well Mode changed to Flowing |
2009-07-12 | Perforation Treatment Performed - Jet Perforation |
2009-08-13 | Perforation Treatment Performed - Jet Perforation |
2009-08-25 | Perforation Treatment Performed - Fractured |
2009-11-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-17 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-02-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-15 | Perforation | 704.00 | 709.00 | 20 |
2009-08-13 | Perforation | 537.00 | 538.50 | 13 |
2009-08-13 | Perforation | 530.00 | 530.50 | 13 |
2009-08-13 | Perforation | 523.70 | 524.20 | 13 |
2009-08-13 | Perforation | 515.60 | 517.10 | 13 |
2009-08-13 | Perforation | 513.50 | 514.50 | 13 |
2009-08-13 | Perforation | 507.50 | 508.00 | 13 |
2009-08-13 | Perforation | 506.00 | 506.50 | 13 |
2009-08-13 | Perforation | 481.50 | 482.50 | 13 |
2009-08-13 | Perforation | 473.70 | 474.70 | 13 |
2009-08-13 | Perforation | 470.20 | 472.70 | 13 |
2009-03-17 | Fracture | 704.00 | 709.00 | 0 |
2009-08-13 | Perforation | 456.00 | 458.50 | 13 |
2009-08-13 | Perforation | 453.80 | 454.80 | 13 |
2009-08-13 | Perforation | 452.00 | 453.00 | 13 |
2009-08-13 | Perforation | 438.10 | 438.60 | 13 |
2009-08-13 | Perforation | 395.10 | 395.60 | 13 |
2009-08-13 | Perforation | 383.60 | 384.10 | 13 |
2009-08-13 | Perforation | 380.10 | 380.60 | 13 |
2009-08-13 | Perforation | 375.40 | 375.90 | 13 |
2009-08-13 | Perforation | 370.10 | 370.60 | 13 |
2009-08-13 | Perforation | 329.10 | 329.60 | 13 |
2009-07-12 | Perforation | 689.00 | 692.00 | 20 |
2009-08-25 | Fracture | 329.10 | 631.60 | 0 |
2009-08-13 | Perforation | 629.60 | 631.60 | 13 |
2009-08-13 | Perforation | 612.30 | 613.30 | 13 |
2009-08-13 | Perforation | 609.80 | 610.30 | 13 |
2009-08-13 | Perforation | 596.30 | 598.80 | 13 |
2009-08-13 | Perforation | 593.30 | 594.30 | 13 |
2009-08-13 | Perforation | 573.30 | 574.30 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4536 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8744 | 0.0 | 0.0 | 0.0 |
2012 | 8692 | 0.0 | 0.0 | 0.0 |
2013 | 8737 | 0.0 | 0.0 | 0.0 |
2014 | 8700 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8694 | 0.0 | 0.0 | 0.0 |
2017 | 8720 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8706 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]