If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364222205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.101217,"lon":-113.06629,"icon":""}]} |
Location: 00/05-22-036-22W4/0 | |
Location Alias: 00/05-22-36-22 W4M | |
Location Alias 2: 00/05-22-036-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 22 | |
Section: 22 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD MIKWAN 5-22-36-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425574 | |
License Date: 2010-11-05 | |
License Status: Issued | |
Spud Date: 2011-01-24 | |
Final Drill Date: 2011-01-25 | |
Well Total Depth: 1056.00 m | |
Surface Hole Latitude: 52.101217 | |
Surface Hole Longitude: -113.066290 |
Date | Event |
---|---|
2010-11-05 | Obtained License |
2011-01-24 | Direction Drilling Operation Performed - Deviate |
2011-01-24 | Surface Casing Operation Performed |
2011-01-25 | Finished Drilling |
2011-01-25 | Well Mode changed to Drilled and Cased |
2011-01-26 | Production Casing Operation Performed |
2011-01-26 | Rig Released |
2011-02-13 | Well Log Performed |
2011-03-12 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Fractured |
2011-03-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-18 | Well Mode changed to Testing |
2011-03-23 | Well Began Production |
2011-03-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-23 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-12 | Perforation | 536.20 | 537.20 | 13 |
2011-03-12 | Perforation | 398.50 | 401.50 | 13 |
2011-03-12 | Perforation | 375.50 | 376.50 | 13 |
2011-03-12 | Perforation | 441.40 | 441.90 | 13 |
2011-03-12 | Perforation | 434.00 | 435.00 | 13 |
2011-03-12 | Perforation | 421.80 | 422.80 | 13 |
2011-03-12 | Perforation | 673.00 | 673.50 | 13 |
2011-03-12 | Perforation | 669.00 | 669.50 | 13 |
2011-03-12 | Perforation | 660.10 | 662.10 | 13 |
2011-03-12 | Perforation | 1024.90 | 1025.90 | 13 |
2011-03-12 | Perforation | 700.30 | 702.80 | 13 |
2011-03-12 | Perforation | 529.00 | 532.00 | 13 |
2011-03-12 | Perforation | 677.30 | 678.30 | 13 |
2011-03-12 | Perforation | 570.60 | 573.60 | 13 |
2011-03-12 | Perforation | 567.90 | 568.90 | 13 |
2011-03-12 | Perforation | 566.00 | 566.50 | 13 |
2011-03-12 | Perforation | 595.90 | 597.40 | 13 |
2011-03-12 | Perforation | 633.00 | 633.50 | 13 |
2011-03-12 | Perforation | 579.10 | 579.60 | 13 |
2011-03-15 | Fracture | 398.50 | 401.50 | 0 |
2011-03-15 | Fracture | 291.50 | 678.30 | 0 |
2011-03-15 | Fracture | 700.30 | 702.80 | 0 |
2011-03-12 | Perforation | 515.50 | 518.00 | 13 |
2011-03-15 | Fracture | 1024.90 | 1025.90 | 0 |
2011-03-12 | Perforation | 538.10 | 539.10 | 13 |
2011-03-12 | Perforation | 560.20 | 561.20 | 13 |
2011-03-12 | Perforation | 548.80 | 549.80 | 13 |
2011-03-12 | Perforation | 542.70 | 544.20 | 13 |
2011-03-12 | Perforation | 333.90 | 334.40 | 13 |
2011-03-12 | Perforation | 291.50 | 292.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5395 | 0.0 | 0.0 | 0.0 |
2012 | 8716 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8700 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8694 | 0.0 | 0.0 | 0.0 |
2017 | 8720 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8706 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]