If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364222011020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.108867,"lon":-113.114452,"icon":""}]} |
Location: 02/11-20-036-22W4/0 | |
Location Alias: 02/11-20-36-22 W4M | |
Location Alias 2: 02/11-20-036-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 22 | |
Section: 20 | |
County/Municipality: Red Deer County | |
Well Name: EMBER 102 MIKWAN 11-20-36-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420066 | |
License Date: 2010-04-26 | |
License Status: Amended | |
Spud Date: 2010-11-28 | |
Final Drill Date: 2010-12-05 | |
Well Total Depth: 875.00 m | |
Surface Hole Latitude: 52.108867 | |
Surface Hole Longitude: -113.114452 |
Date | Event |
---|---|
2010-04-26 | Obtained License |
2010-11-28 | Lost Circulation Occurred |
2010-11-28 | Surface Casing Operation Performed |
2010-12-05 | Finished Drilling |
2010-12-05 | Production Casing Operation Performed |
2010-12-05 | Rig Released |
2010-12-05 | Well Mode changed to Drilled and Cased |
2010-12-06 | Well Log Performed |
2011-01-16 | Perforation Treatment Performed - Jet Perforation |
2011-01-21 | Perforation Treatment Performed - Fractured |
2011-01-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-27 | Well Mode changed to Testing |
2011-02-06 | Well Began Production |
2011-02-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-06 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-16 | Perforation | 389.40 | 390.40 | 13 |
2011-01-16 | Perforation | 440.00 | 442.00 | 13 |
2011-01-16 | Perforation | 274.20 | 274.70 | 13 |
2011-01-16 | Perforation | 374.90 | 376.90 | 13 |
2011-01-16 | Perforation | 373.20 | 373.70 | 13 |
2011-01-16 | Perforation | 279.10 | 280.10 | 13 |
2011-01-16 | Perforation | 414.20 | 414.70 | 13 |
2011-01-16 | Perforation | 492.50 | 493.50 | 13 |
2011-01-16 | Perforation | 488.00 | 489.50 | 13 |
2011-01-16 | Perforation | 510.80 | 512.30 | 13 |
2011-01-16 | Perforation | 793.80 | 794.80 | 13 |
2011-01-16 | Perforation | 384.00 | 385.00 | 13 |
2011-01-16 | Perforation | 743.00 | 744.00 | 13 |
2011-01-16 | Perforation | 485.40 | 486.40 | 13 |
2011-01-16 | Perforation | 428.50 | 430.00 | 13 |
2011-01-16 | Perforation | 415.60 | 417.60 | 13 |
2011-01-16 | Perforation | 420.70 | 421.70 | 13 |
2011-01-16 | Perforation | 477.50 | 480.50 | 13 |
2011-01-16 | Perforation | 457.00 | 458.00 | 13 |
2011-01-21 | Fracture | 244.00 | 493.50 | 0 |
2011-01-21 | Fracture | 440.00 | 442.00 | 0 |
2011-01-21 | Fracture | 510.80 | 512.30 | 0 |
2011-01-16 | Perforation | 379.80 | 380.80 | 13 |
2011-01-21 | Fracture | 743.00 | 744.00 | 0 |
2011-01-21 | Fracture | 793.80 | 794.80 | 0 |
2011-01-16 | Perforation | 395.20 | 396.20 | 13 |
2011-01-16 | Perforation | 411.80 | 412.30 | 13 |
2011-01-16 | Perforation | 408.20 | 408.70 | 13 |
2011-01-16 | Perforation | 398.70 | 399.70 | 13 |
2011-01-16 | Perforation | 249.10 | 250.10 | 13 |
2011-01-16 | Perforation | 244.00 | 245.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7914 | 0.0 | 0.0 | 0.0 |
2012 | 8670 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8700 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8694 | 0.0 | 0.0 | 0.0 |
2017 | 8720 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8706 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-11-28 | Lost Circulation | 35.00 | 45.00 |
For data sources see[6]