X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364221805000

Well Details

Well ID: 0364221805000
Loading map...
Location: 00/05-18-036-22W4/0
Location Alias: 00/05-18-36-22 W4M
Location Alias 2: 00/05-18-036-22 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 22
Section: 18
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 5-18-36-22
Operator Name: Ember Resources Inc.
License Number: 0356033
License Date: 2006-04-25
License Status: Issued
Spud Date: 2006-05-20
Final Drill Date: 2006-05-23
Well Total Depth: 900.00 m
Surface Hole Latitude: 52.088494
Surface Hole Longitude: -113.142652

For data sources see[1][2]

Well History

Date Event
2006-04-25 Obtained License
2006-05-21 Surface Casing Operation Performed
2006-05-23 Finished Drilling
2006-05-23 Production Casing Operation Performed
2006-05-23 Rig Released
2006-05-23 Well Mode changed to Drilled and Cased
2006-05-31 Well Log Performed
2006-06-06 Perforation Treatment Performed - Jet Perforation
2006-06-06 Well Log Performed
2006-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-24 Perforation Treatment Performed - Jet Perforation
2006-06-24 Plug Back Performed
2006-06-24 Well Log Performed
2006-06-24 Well Mode changed to Abandoned Zone
2006-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-25 Perforation Treatment Performed - Jet Perforation
2006-09-30 Perforation Treatment Performed - Fractured
2006-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-31 Perforation Treatment Performed - Jet Perforation
2006-10-31 Plug Back Performed
2006-10-31 Well Log Performed
2006-11-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-06-06 Perforation 820.00 823.00 17
2006-10-31 Perforation 542.90 543.20 14
2006-10-31 Perforation 539.00 539.90 14
2006-10-31 Perforation 538.00 538.40 14
2006-10-31 Perforation 519.00 520.00 14
2006-10-31 Perforation 518.50 518.80 14
2006-10-31 Perforation 515.60 516.10 14
2006-10-31 Perforation 506.80 509.20 14
2006-10-31 Perforation 484.10 484.90 14
2006-10-31 Perforation 452.20 453.80 14
2006-10-31 Perforation 448.60 449.10 14
2006-06-24 Packing Device Capped w/Cement 805.00 813.00 0
2006-10-31 Perforation 441.40 443.50 14
2006-10-31 Perforation 430.70 431.00 14
2006-10-31 Perforation 422.50 422.80 14
2006-10-31 Perforation 419.80 420.20 14
2006-10-31 Perforation 413.10 414.10 14
2006-10-31 Perforation 404.90 406.30 14
2006-10-31 Perforation 398.60 400.50 14
2006-10-31 Perforation 396.10 397.10 14
2006-10-31 Perforation 383.20 384.00 14
2006-10-31 Perforation 355.10 356.10 14
2006-06-24 Perforation 792.00 796.50 17
2006-10-31 Perforation 341.20 341.50 14
2006-10-31 Perforation 339.60 339.90 14
2006-11-06 Fracture 339.60 556.60 0
2006-06-25 Packing Device Capped w/Cement 777.00 785.00 0
2006-06-25 Perforation 606.00 607.00 17
2006-06-25 Perforation 600.50 604.50 17
2006-09-30 Fracture 600.50 607.00 0
2006-10-31 Packing Device Capped w/Cement 590.50 598.50 0
2006-10-31 Perforation 556.30 556.60 14

For data sources see[4]



References