If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364220613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.071195,"lon":-113.140487,"icon":""}]} |
Location: 00/13-06-036-22W4/0 | |
Location Alias: 00/13-06-36-22 W4M | |
Location Alias 2: 00/13-06-036-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 22 | |
Section: 06 | |
County/Municipality: Red Deer County | |
Well Name: EMBER MIKWAN 13-6-36-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0403466 | |
License Date: 2008-11-06 | |
License Status: Issued | |
Spud Date: 2009-01-02 | |
Final Drill Date: 2009-01-04 | |
Well Total Depth: 797.00 m | |
Surface Hole Latitude: 52.071195 | |
Surface Hole Longitude: -113.140487 |
Date | Event |
---|---|
2008-11-06 | Obtained License |
2009-01-03 | Surface Casing Operation Performed |
2009-01-04 | Finished Drilling |
2009-01-04 | Production Casing Operation Performed |
2009-01-04 | Well Mode changed to Drilled and Cased |
2009-01-05 | Rig Released |
2009-01-27 | Well Log Performed |
2009-02-20 | Perforation Treatment Performed - Jet Perforation |
2009-02-20 | Well Log Performed |
2009-02-28 | Perforation Treatment Performed - Fractured |
2009-05-14 | Well Began Production |
2009-05-14 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-05-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-20 | Perforation | 741.70 | 742.70 | 13 |
2009-02-20 | Perforation | 626.40 | 626.90 | 13 |
2009-02-20 | Perforation | 615.60 | 618.10 | 13 |
2009-02-20 | Perforation | 613.50 | 614.00 | 13 |
2009-02-20 | Perforation | 611.40 | 611.90 | 13 |
2009-02-20 | Perforation | 583.20 | 583.70 | 13 |
2009-02-20 | Perforation | 572.70 | 573.60 | 13 |
2009-02-20 | Perforation | 562.10 | 563.50 | 13 |
2009-02-20 | Perforation | 554.10 | 554.60 | 13 |
2009-02-20 | Perforation | 549.20 | 550.70 | 13 |
2009-02-20 | Perforation | 483.10 | 483.60 | 13 |
2009-02-20 | Perforation | 716.00 | 716.90 | 13 |
2009-02-20 | Perforation | 461.40 | 461.90 | 13 |
2009-02-20 | Perforation | 418.80 | 419.30 | 13 |
2009-02-20 | Perforation | 414.60 | 415.10 | 13 |
2009-02-28 | Fracture | 741.70 | 742.70 | 0 |
2009-02-28 | Fracture | 714.80 | 716.90 | 0 |
2009-02-28 | Fracture | 711.70 | 712.40 | 0 |
2009-02-28 | Fracture | 700.20 | 702.70 | 0 |
2009-02-28 | Fracture | 697.60 | 698.10 | 0 |
2009-02-28 | Fracture | 674.30 | 675.00 | 0 |
2009-02-28 | Fracture | 663.50 | 664.00 | 0 |
2009-02-20 | Perforation | 714.80 | 715.30 | 13 |
2009-02-28 | Fracture | 629.80 | 631.80 | 0 |
2009-02-28 | Fracture | 626.40 | 626.90 | 0 |
2009-02-28 | Fracture | 613.50 | 618.10 | 0 |
2009-02-28 | Fracture | 611.40 | 611.90 | 0 |
2009-02-28 | Fracture | 583.20 | 583.70 | 0 |
2009-02-28 | Fracture | 572.70 | 573.60 | 0 |
2009-02-28 | Fracture | 562.10 | 563.50 | 0 |
2009-02-28 | Fracture | 554.10 | 554.60 | 0 |
2009-02-28 | Fracture | 549.20 | 550.70 | 0 |
2009-02-28 | Fracture | 483.10 | 483.60 | 0 |
2009-02-20 | Perforation | 711.70 | 712.40 | 13 |
2009-02-28 | Fracture | 461.40 | 461.90 | 0 |
2009-02-28 | Fracture | 418.80 | 419.30 | 0 |
2009-02-28 | Fracture | 414.60 | 415.10 | 0 |
2009-02-20 | Perforation | 700.20 | 702.70 | 13 |
2009-02-20 | Perforation | 697.60 | 698.10 | 13 |
2009-02-20 | Perforation | 674.30 | 675.00 | 13 |
2009-02-20 | Perforation | 663.50 | 664.00 | 13 |
2009-02-20 | Perforation | 629.80 | 631.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 5508 | 0.0 | 0.0 | 0.0 |
2010 | 8476 | 0.0 | 0.0 | 0.0 |
2011 | 8570 | 0.0 | 0.0 | 0.0 |
2012 | 8658 | 0.0 | 0.0 | 0.0 |
2013 | 8583 | 0.0 | 0.0 | 0.0 |
2014 | 8514 | 0.0 | 0.0 | 0.0 |
2015 | 8509 | 0.0 | 0.0 | 0.0 |
2016 | 8490 | 0.0 | 0.0 | 0.0 |
2017 | 7935 | 0.0 | 0.0 | 0.0 |
2018 | 8226 | 0.0 | 0.0 | 0.0 |
2019 | 3492 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[5]