If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364202816020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.128792,"lon":-112.789966,"icon":""}]} |
Location: 02/16-28-036-20W4/0 | |
Location Alias: 02/16-28-36-20 W4M | |
Location Alias 2: 02/16-28-036-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 20 | |
Section: 28 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW 102 FENNW 16-28-36-20 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0432618 | |
License Date: 2011-03-28 | |
License Status: Issued | |
Spud Date: 2011-10-19 | |
Final Drill Date: 2011-10-22 | |
Well Total Depth: 602.00 m | |
Surface Hole Latitude: 52.128792 | |
Surface Hole Longitude: -112.789966 |
Date | Event |
---|---|
2011-03-28 | Obtained License |
2011-10-19 | Direction Drilling Operation Performed - Deviate |
2011-10-21 | Surface Casing Operation Performed |
2011-10-22 | Finished Drilling |
2011-10-22 | Production Casing Operation Performed |
2011-10-22 | Well Mode changed to Drilled and Cased |
2011-10-23 | Rig Released |
2011-11-15 | Well Log Performed |
2011-11-29 | Perforation Treatment Performed - Jet Perforation |
2012-02-17 | Well Began Production |
2012-02-17 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-02-17 | Well Mode changed to Flowing |
2013-07-02 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-19 | 14.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-29 | Perforation | 414.50 | 416.50 | 15 |
2011-11-29 | Perforation | 292.00 | 297.50 | 15 |
2011-11-29 | Perforation | 278.50 | 280.50 | 15 |
2011-11-29 | Perforation | 272.50 | 275.00 | 15 |
2011-11-29 | Perforation | 265.00 | 267.00 | 15 |
2011-11-29 | Perforation | 255.20 | 257.70 | 15 |
2013-07-02 | Multi-Stage Fracture | 414.50 | 416.50 | 0 |
2013-07-02 | Multi-Stage Fracture | 406.00 | 408.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 390.00 | 391.50 | 0 |
2013-07-02 | Multi-Stage Fracture | 349.00 | 352.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 341.50 | 344.50 | 0 |
2011-11-29 | Perforation | 406.00 | 408.00 | 15 |
2013-07-02 | Multi-Stage Fracture | 333.00 | 334.50 | 0 |
2013-07-02 | Multi-Stage Fracture | 314.50 | 315.50 | 0 |
2013-07-02 | Multi-Stage Fracture | 300.50 | 302.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 292.00 | 297.50 | 0 |
2013-07-02 | Multi-Stage Fracture | 278.50 | 280.50 | 0 |
2013-07-02 | Multi-Stage Fracture | 272.50 | 275.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 265.00 | 267.00 | 0 |
2013-07-02 | Multi-Stage Fracture | 255.20 | 257.70 | 0 |
2011-11-29 | Perforation | 390.00 | 391.50 | 15 |
2011-11-29 | Perforation | 349.00 | 352.00 | 15 |
2011-11-29 | Perforation | 341.50 | 344.50 | 15 |
2011-11-29 | Perforation | 333.00 | 334.50 | 15 |
2011-11-29 | Perforation | 314.50 | 315.50 | 15 |
2011-11-29 | Perforation | 310.50 | 313.00 | 15 |
2011-11-29 | Perforation | 300.50 | 302.00 | 15 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-02 | 2013-07-02 | 469 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 4416 | 0.0 | 0.0 | 0.0 |
2014 | 8572 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8423 | 0.0 | 0.0 | 0.0 |
2017 | 6698 | 0.0 | 0.0 | 0.0 |
2018 | 5329 | 0.0 | 0.0 | 0.0 |
2019 | 5401 | 0.0 | 0.0 | 0.0 |
2020 | 1854 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-07-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]