X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364201415000

Well Details

Well ID: 0364201415000
Loading map...
Location: 00/15-14-036-20W4/0
Location Alias: 00/15-14-36-20 W4M
Location Alias 2: 00/15-14-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 14
County/Municipality: County of Stettler No. 6
Well Name: RANDON NO.15
Operator Name: Gulf Canada Limited
License Number: 0004411
License Date: 1952-03-21
License Status: RecCertified
Spud Date: 1952-03-30
Final Drill Date: 1952-04-16
Well Total Depth: 1601.10 m
Surface Hole Latitude: 52.097450
Surface Hole Longitude: -112.752052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-21 Obtained License
1952-04-16 Finished Drilling
1952-04-16 Well Mode changed to Drilled and Cased
1952-04-20 Liner Casing Operation Performed
1952-04-23 Perforation Treatment Performed - Open-Hole Completion
1952-05-27 Well Began Production
1952-05-27 Well Fluid changed to Crude Oil
1952-05-27 Well Mode changed to Flowing
1968-04-20 Perforation Treatment Performed - Cement Squeeze
1968-04-28 Perforation Treatment Performed - Jet Perforation
1968-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-01 Well Fluid changed to Crude Oil
1980-04-01 Well Mode changed to Pumping
1983-10-01 Well Fluid changed to Crude Oil
1983-10-01 Well Mode changed to Suspended
1989-07-07 Well Log Performed
1989-07-08 Well Log Performed
1989-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-09 Plug Back Performed
1989-07-09 Well Fluid changed to Crude Oil
1989-07-09 Well Mode changed to Abandoned Zone
1989-07-10 Well Log Performed
1989-07-11 Perforation Treatment Performed - Jet Perforation
1990-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-22 Perforation Treatment Performed - Jet Perforation
1990-03-22 Perforation Treatment Performed - Remedial Casing
1990-03-22 Well Log Performed
1990-03-23 Plug Back Performed
1990-03-26 Well Abandoned
2004-11-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-23 Open Hole/Barefoot Completion 1583.40 1601.10 0
1990-03-22 Remedial Casing Cementing 208.60 209.60 0
1968-04-20 Cement Squeeze 1583.40 1601.10 0
1968-04-28 Perforation 1586.20 1587.40 13
1968-04-29 Acid Treatment 1586.20 1587.40 0
1980-04-01 Acid Treatment 1586.20 1587.40 0
1989-07-09 Packing Device Capped w/Cement 1338.00 1346.00 0
1989-07-11 Perforation 1269.40 1272.50 13
1990-03-22 Packing Device Capped w/Cement 1257.00 1265.00 0
1990-03-22 Perforation 208.60 209.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4894 0.0 0.0 0.0
1968 3980 0.0 0.0 0.0
1969 4156 0.0 0.0 0.0
1970 4150 0.0 0.0 0.0
1971 3883 0.0 0.0 0.0
1972 5358 0.0 0.0 0.0
1973 7228 0.0 0.0 0.0
1974 6883 0.0 0.0 0.0
1975 4927 0.0 0.0 0.0
1976 4532 0.0 0.0 0.0
1977 4332 0.0 0.0 0.0
1978 5004 0.0 0.0 0.0
1979 7792 0.0 0.0 0.0
1980 5014 0.0 0.0 0.0
1981 1608 0.0 0.0 0.0

For data sources see[5]

References