X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364200214002

Well Details

Well ID: 0364200214002
Loading map...
Location: 00/14-02-036-20W4/2
Location Alias: 00/14-02-36-20 W4M
Location Alias 2: 00/14-02-036-20 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 02
County/Municipality: County of Stettler No. 6
Well Name: ELIZABETH NO. 14
Operator Name: Gulf Canada Limited
License Number: 0007541
License Date: 1953-12-31
License Status: RecCertified
Spud Date: 1954-01-31
Final Drill Date: 1954-02-24
Well Total Depth: 1656.90 m
Surface Hole Latitude: 52.068787
Surface Hole Longitude: -112.757295

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-31 Obtained License
1954-02-24 Finished Drilling
1954-02-24 Well Mode changed to Drilled and Cased
1954-02-25 Production Casing Operation Performed
1954-02-27 Perforation Treatment Performed - Open-Hole Completion
1979-10-10 Perforation Treatment Performed - Cement Plug
1979-10-12 Perforation Treatment Performed - Jet Perforation
1980-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-01 Perforation Treatment Performed - Fractured
1980-02-04 Well Began Production
1980-02-04 Well Fluid changed to Gas
1980-02-04 Well Mode changed to Flowing
1980-07-01 Well Fluid changed to Gas
1980-07-01 Well Mode changed to Suspended
1990-04-05 Well Log Performed
1990-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-01 Plug Back Performed
1990-05-01 Well Fluid changed to Gas
1990-05-01 Well Mode changed to Abandoned
1990-05-02 Perforation Treatment Performed - Jet Perforation
1990-05-02 Perforation Treatment Performed - Remedial Casing
1990-05-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-27 Open Hole/Barefoot Completion 1652.00 1656.90 0
1979-10-10 Cement Plug 1537.00 1656.90 0
1979-10-12 Perforation 1354.20 1356.40 13
1980-01-31 Acid Treatment 1354.20 1356.40 0
1980-02-01 Fracture 1354.20 1356.40 0
1990-05-01 Packing Device Capped w/Cement 1340.00 1350.00 0
1990-05-02 Perforation 183.00 184.00 13
1990-05-02 Remedial Casing Cementing 183.00 184.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 53 0.0 0.0 0.0
1980 299 0.0 0.0 0.0

For data sources see[5]

References