X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364110502000

Well Details

Well ID: 0364110502000
Loading map...
Location: 00/02-05-036-11W4/0
Location Alias: 00/02-05-36-11 W4M
Location Alias 2: 00/02-05-036-11 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 11
Section: 05
County/Municipality: County of Paintearth No. 18
Well Name: LL&E ET AL HAMIL 2-5-36-11
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0034545
License Date: 1968-07-30
License Status: RecCertified
Spud Date: 1968-08-01
Final Drill Date: 1968-08-03
Well Total Depth: 938.80 m
Surface Hole Latitude: 52.057890
Surface Hole Longitude: -111.537028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-07-30 Obtained License
1968-08-03 Finished Drilling
1968-08-03 Well Mode changed to Drilled and Cased
1968-08-04 Production Casing Operation Performed
1968-12-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1968-12-15 Perforation Treatment Performed - Jet Perforation
1968-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-01 Well Began Injection
1969-05-01 Well Fluid changed to Water
1969-05-01 Well Type changed to Injection
1984-11-01 Well Fluid changed to Water
1984-11-01 Well Mode changed to Suspended
1984-11-01 Well Type changed to Injection
1988-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-05 Perforation Treatment Performed - Jet Perforation
1988-07-05 Plug Back Performed
1988-07-05 Well Abandoned
1988-07-05 Well Fluid changed to Water
1988-07-05 Well Mode changed to Abandoned
1988-07-05 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-15 Hydra Jet Perforation 916.20 916.20 0
1968-12-15 Perforation 917.10 917.80 13
1968-12-20 Acid Treatment 916.20 917.80 0
1988-07-05 Packing Device Capped w/Cement 884.00 892.00 0
1988-07-05 Perforation 250.00 250.50 13
1988-07-05 Packing Device Capped w/Cement 235.00 243.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References