X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364082911C00

Well Details

Well ID: 0364082911C00
Loading map...
Location: C0/11-29-036-08W4/0
Location Alias: C0/11-29-36-08 W4M
Location Alias 2: C0/11-29-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 29
County/Municipality: Special Areas No. 4
Well Name: STRATH ET AL PROVOST 11C-29-36-8
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0140627
License Date: 1989-08-11
License Status: RecCertified
Spud Date: 1989-09-19
Final Drill Date: 1989-09-22
Well Total Depth: 1088.00 m
Surface Hole Latitude: 52.121826
Surface Hole Longitude: -111.115970

For data sources see[1][2]

Well History

Date Event
1989-08-11 Obtained License
1989-09-19 Surface Casing Operation Performed
1989-09-20 Direction Drilling Operation Performed - Deviate
1989-09-22 Finished Drilling
1989-09-22 Well Mode changed to Drilled and Cased
1989-09-23 Drill Stem Test Performed
1989-09-23 Well Log Performed
1989-09-24 Production Casing Operation Performed
1989-09-24 Rig Released
1989-09-26 Well Log Performed
1989-10-01 Perforation Treatment Performed - Jet Perforation
1989-10-01 Well Log Performed
1989-10-20 Well Began Production
1989-10-20 Well Fluid changed to Crude Oil
1989-10-20 Well Mode changed to Pumping
1998-10-20 Well Fluid changed to Crude Oil
1998-10-20 Well Mode changed to Suspended
1998-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-25 Plug Back Performed
1998-10-25 Well Log Performed
1998-11-03 Well Abandoned
1998-11-03 Well Fluid changed to Crude Oil
1998-11-03 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-09-20 248.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-01 Perforation 1058.00 1061.00 13
1998-10-25 Packing Device Capped w/Cement 1044.00 1052.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1682 0.0 0.0 0.0
1990 8595 0.0 0.0 0.0
1991 8069 0.0 0.0 0.0
1992 8513 0.0 0.0 0.0
1993 8587 0.0 0.0 0.0
1994 8648 0.0 0.0 0.0
1995 8704 0.0 0.0 0.0
1996 8362 0.0 0.0 0.0
1997 8507 0.0 0.0 0.0
1998 6890 0.0 0.0 0.0

For data sources see[6]

References