X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364081108030

Well Details

Well ID: 0364081108030
Loading map...
Location: 03/08-11-036-08W4/0
Location Alias: 03/08-11-36-08 W4M
Location Alias 2: 03/08-11-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 11
County/Municipality: Special Areas No. 4
Well Name: KARVE 103 HZ PROVOST 8-11-36-8
Operator Name: Karve Energy Inc.
License Number: 0483709
License Date: 2017-05-25
License Status: Amended
Spud Date: 2017-08-17
Final Drill Date: 2017-08-19
Well Total Depth: 1595.00 m
Surface Hole Latitude: 52.070950
Surface Hole Longitude: -111.039978

For data sources see[1][2]

Well History

Date Event
2017-05-25 Obtained License
2017-08-17 Surface Casing Operation Performed
2017-08-18 Direction Drilling Operation Performed - Deviate
2017-08-18 Direction Drilling Operation Performed - Horizontal
2017-08-18 Well Log Performed
2017-08-19 Finished Drilling
2017-08-19 Production Casing Operation Performed
2017-08-19 Rig Released
2017-08-19 Well Log Performed
2017-08-19 Well Mode changed to Drilled and Cased
2017-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-21 Well Began Production
2017-09-21 Well Fluid changed to Crude Oil
2017-09-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-17 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-18 605.10 Deviate (5 - 79 degrees)
2017-08-18 968.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-09 Multi-Stage Fracture 1556.60 1556.70 0
2017-09-09 Multi-Stage Fracture 1320.30 1320.40 0
2017-09-09 Multi-Stage Fracture 1284.10 1284.20 0
2017-09-09 Multi-Stage Fracture 1258.90 1259.00 0
2017-09-09 Multi-Stage Fracture 1233.70 1233.80 0
2017-09-09 Multi-Stage Fracture 1208.50 1208.60 0
2017-09-09 Multi-Stage Fracture 1183.30 1183.40 0
2017-09-09 Multi-Stage Fracture 1107.00 1107.10 0
2017-09-09 Multi-Stage Fracture 1082.00 1082.10 0
2017-09-09 Multi-Stage Fracture 1045.20 1045.30 0
2017-09-09 Multi-Stage Fracture 1020.30 1020.40 0
2017-09-09 Multi-Stage Fracture 1531.30 1531.40 0
2017-09-09 Multi-Stage Fracture 995.30 995.40 0
2017-09-09 Multi-Stage Fracture 1505.90 1506.00 0
2017-09-09 Multi-Stage Fracture 1480.80 1480.90 0
2017-09-09 Multi-Stage Fracture 1455.50 1455.60 0
2017-09-09 Multi-Stage Fracture 1430.00 1430.10 0
2017-09-09 Multi-Stage Fracture 1404.90 1405.00 0
2017-09-09 Multi-Stage Fracture 1379.60 1379.70 0
2017-09-09 Multi-Stage Fracture 1354.30 1354.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-09 2017-09-09 872 710 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 72.4914 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 16.4104 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 10.2565 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0071 N/A
Methyl Alcohol 67-56-1 100 0.0071 N/A
Non-Hazardous Ingredients Not Available 100 0.0071 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0698 N/A
Sodium chloride 7647-14-5 100 0.0698 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1072 N/A
Non-Hazardous Ingredients Not Available 100 0.1072 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1172 N/A
Water 7732-18-5 100 0.1172 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3985 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3985 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.1415 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.1415 N/A
Methanol 67-56-1 100 0.1415 N/A
Monoethanolamine 141-43-5 100 0.1415 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.1415 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.1415 N/A
Water 7732-18-5 100 0.1415 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-06 2017-09-06 Municipal Water 485
2017-09-06 2017-09-06 Municipal Water 260

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2412 0.0 0.0 0.0
2018 8610 0.0 0.0 0.0
2019 8500 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-19 No Incident Encountered 0.00 0.00
2017-09-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References