X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364081012000

Well Details

Well ID: 0364081012000
Loading map...
Location: 00/12-10-036-08W4/0
Location Alias: 00/12-10-36-08 W4M
Location Alias 2: 00/12-10-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 10
County/Municipality: Special Areas No. 4
Well Name: KARVE PROVOST 12-10-36-8
Operator Name: Karve Energy Inc.
License Number: 0082303
License Date: 1980-04-23
License Status: Abandoned
Spud Date: 1980-06-22
Final Drill Date: 1980-06-27
Well Total Depth: 960.00 m
Surface Hole Latitude: 52.079657
Surface Hole Longitude: -111.073851

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-23 Obtained License
1980-06-24 Drill Stem Test Performed
1980-06-25 Drill Stem Test Performed
1980-06-27 Finished Drilling
1980-06-27 Well Mode changed to Drilled and Cased
1980-06-28 Production Casing Operation Performed
1980-07-18 Perforation Treatment Performed - Jet Perforation
1980-09-06 Perforation Treatment Performed - Jet Perforation
1980-09-07 Perforation Treatment Performed - Fractured
1980-10-01 Well Began Production
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Pumping
1996-10-03 Well Fluid changed to Crude Oil
1996-10-03 Well Mode changed to Suspended
2010-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-09 Plug Back Performed
2010-08-09 Well Fluid changed to Crude Oil
2010-08-09 Well Log Performed
2010-08-09 Well Mode changed to Abandoned Zone
2019-09-04 Well Abandoned
2019-09-04 Well Fluid changed to Crude Oil
2019-09-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-18 Perforation 879.50 882.50 10
1980-07-18 Perforation 884.00 886.00 10
1980-09-06 Perforation 879.50 882.50 10
1980-09-07 Fracture 879.50 886.00 0
2010-08-06 Packing Device Capped w/Cement 862.00 870.00 0
2010-08-09 Packing Device Capped w/Cement 861.60 869.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2544 0.0 0.0 0.0
1981 8717 0.0 0.0 0.0
1982 8495 0.0 0.0 0.0
1983 8228 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8663 0.0 0.0 0.0
1988 6263 0.0 0.0 0.0
1989 3600 0.0 0.0 0.0
1991 4058 0.0 0.0 0.0
1992 8639 0.0 0.0 0.0
1993 1608 0.0 0.0 0.0
1994 192 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References