X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364080302000

Well Details

Well ID: 0364080302000
Loading map...
Location: 00/02-03-036-08W4/0
Location Alias: 00/02-03-36-08 W4M
Location Alias 2: 00/02-03-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 03
County/Municipality: Special Areas No. 4
Well Name: CABRE PROVOST 2-3-36-8
Operator Name: Enerplus Corporation
License Number: 0181927
License Date: 1995-11-08
License Status: Re-Entered
Spud Date: 1995-11-20
Final Drill Date: 1995-11-23
Well Total Depth: 1125.00 m
Surface Hole Latitude: 52.057276
Surface Hole Longitude: -111.061974

For data sources see[1][2]

Well History

Date Event
1995-11-08 Obtained License
1995-11-20 Well Log Performed
1995-11-21 Surface Casing Operation Performed
1995-11-23 Finished Drilling
1995-11-23 Well Log Performed
1995-11-23 Well Mode changed to Drilled and Cased
1995-11-24 Drill Stem Test Performed
1995-11-24 Production Casing Operation Performed
1995-11-25 Rig Released
1995-12-01 Well Log Performed
1995-12-02 Perforation Treatment Performed - Jet Perforation
1995-12-02 Well Log Performed
1995-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-03 Plug Back Performed
1995-12-03 Well Log Performed
1995-12-05 Perforation Treatment Performed - Jet Perforation
1995-12-05 Well Log Performed
1995-12-16 Well Began Production
1995-12-16 Well Fluid changed to Crude Oil
1995-12-16 Well Mode changed to Pumping
1996-01-07 Perforation Treatment Performed - Fractured
1997-09-30 Well Fluid changed to Crude Oil
1997-09-30 Well Mode changed to Suspended
2000-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-08 Plug Back Performed
2000-06-08 Well Abandoned
2000-06-08 Well Fluid changed to Crude Oil
2000-06-08 Well Log Performed
2000-06-08 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-02 Perforation 1096.00 1098.00 13
1995-12-03 Packing Device Capped w/Cement 1083.00 1091.00 0
1995-12-05 Perforation 1016.50 1017.50 13
1995-12-05 Perforation 1019.00 1021.80 13
1995-12-05 Perforation 1022.20 1023.80 13
1995-12-05 Perforation 1024.80 1026.00 13
1996-01-07 Fracture 1016.50 1026.00 0
2000-06-08 Packing Device Capped w/Cement 987.00 1005.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 354 0.0 0.0 0.0
1996 5952 0.0 0.0 0.0

For data sources see[5]

References