If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364061405020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.089278,"lon":-110.741927,"icon":""}]} |
Location: 02/05-14-036-06W4/0 | |
Location Alias: 02/05-14-36-06 W4M | |
Location Alias 2: 02/05-14-036-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 06 | |
Section: 14 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ACL 102 HZ PROVOST 5-14-36-6 | |
Operator Name: Battle River Energy Ltd. | |
License Number: 0449498 | |
License Date: 2012-10-26 | |
License Status: Abandoned | |
Spud Date: 2012-12-01 | |
Final Drill Date: 2012-12-09 | |
Well Total Depth: 2344.00 m | |
Surface Hole Latitude: 52.089278 | |
Surface Hole Longitude: -110.741927 |
Date | Event |
---|---|
2012-10-26 | Obtained License |
2012-12-02 | Surface Casing Operation Performed |
2012-12-02 | Well Log Performed |
2012-12-04 | Direction Drilling Operation Performed - Deviate |
2012-12-04 | Direction Drilling Operation Performed - Horizontal |
2012-12-04 | Well Log Performed |
2012-12-05 | Intermediate Casing Operation Performed |
2012-12-09 | Finished Drilling |
2012-12-09 | Well Log Performed |
2012-12-09 | Well Mode changed to Drilled and Cased |
2012-12-10 | Liner Casing Operation Performed |
2012-12-10 | Perforation Treatment Performed - Open-Hole Completion |
2012-12-10 | Rig Released |
2013-01-15 | Well Log Performed |
2013-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-05 | Well Began Production |
2013-02-05 | Well Fluid changed to Crude Oil |
2013-02-05 | Well Mode changed to Pumping |
2014-09-29 | Well Fluid changed to Crude Oil |
2014-09-29 | Well Mode changed to Suspended |
2016-11-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-11-10 | Plug Back Performed |
2016-11-10 | Well Fluid changed to Crude Oil |
2016-11-10 | Well Mode changed to Abandoned Zone |
2016-11-23 | Well Abandoned |
2016-11-23 | Well Fluid changed to Crude Oil |
2016-11-23 | Well Mode changed to Abandoned |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-12-01 | Trinidad Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-04 | 571.70 | Deviate (5 - 79 degrees) |
2012-12-04 | 1021.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-10 | Open Hole/Barefoot Completion | 2340.00 | 2344.00 | 0 |
2013-01-17 | Multi-Stage Fracture | 1559.40 | 1559.50 | 0 |
2013-01-17 | Multi-Stage Fracture | 1483.00 | 1483.10 | 0 |
2013-01-17 | Multi-Stage Fracture | 1302.20 | 1302.30 | 0 |
2013-01-17 | Multi-Stage Fracture | 1211.40 | 1211.50 | 0 |
2013-01-17 | Multi-Stage Fracture | 1119.90 | 1120.00 | 0 |
2016-11-10 | Packing Device Capped w/Cement | 1019.00 | 1027.00 | 0 |
2013-01-17 | Multi-Stage Fracture | 2302.30 | 2302.40 | 0 |
2013-01-17 | Multi-Stage Fracture | 2081.40 | 2081.50 | 0 |
2013-01-17 | Multi-Stage Fracture | 2004.30 | 2004.40 | 0 |
2013-01-17 | Multi-Stage Fracture | 1927.00 | 1927.10 | 0 |
2013-01-17 | Multi-Stage Fracture | 1850.40 | 1850.50 | 0 |
2013-01-17 | Multi-Stage Fracture | 1789.20 | 1789.30 | 0 |
2013-01-17 | Multi-Stage Fracture | 1712.60 | 1712.70 | 0 |
2013-01-17 | Multi-Stage Fracture | 1636.20 | 1636.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-17 | 2013-01-17 | 895 | 1,037 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 78.2222 | N/A | |||
Frac Sand - regular | Trican | silica crystalline | 14808-60-7 | 100 | 10.2848 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0586 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0586 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0586 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0586 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0586 | N/A | ||||
BXL-A | Trican | Breaker | diethanolamine | 111-42-2 | 100 | 0.1009 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1009 | N/A | ||||
triethanolamine | 102-71-6 | 100 | 0.1009 | N/A | ||||
WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0391 | N/A | |
DRA-2 | Trican | Buffer | non-hazardous ingredients | Not Available | 100 | 0.1777 | N/A | |
CC-55 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.1713 | N/A | |
formic acid | 64-18-6 | 100 | 0.1713 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1713 | N/A | ||||
WXB-10 | Trican | Crosslinker | borate salts | 1319-33-1 | 100 | 0.1675 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.1675 | N/A | ||||
WG-111L | Trican | Gelling Agent | distillates (petroleum). hydrotreated middle | 64742-46-7 | 100 | 0.4928 | N/A | |
polysaccharide blend | Not Available | 100 | 0.4928 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-01-15 | 2013-01-18 | Waste Water - Municipal | 1132 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 2632 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-10 | No Incident Encountered | 0.00 | 0.00 |
2013-01-24 | No Incident Encountered | 0.00 | 0.00 |
2016-11-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]