X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052514030

Well Details

Well ID: 0364052514030
Loading map...
Location: 03/14-25-036-05W4/0
Location Alias: 03/14-25-36-05 W4M
Location Alias 2: 03/14-25-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: BARR ET AL 14B PROVOST 14-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0166070
License Date: 1994-03-23
License Status: Abandoned
Spud Date: 1994-04-05
Final Drill Date: 1994-04-09
Well Total Depth: 906.00 m
Surface Hole Latitude: 52.126827
Surface Hole Longitude: -110.595192

For data sources see[1][2]

Well History

Date Event
1994-03-23 Obtained License
1994-04-06 Surface Casing Operation Performed
1994-04-07 Direction Drilling Operation Performed - Deviate
1994-04-08 Well Log Performed
1994-04-09 Finished Drilling
1994-04-09 Well Log Performed
1994-04-09 Well Mode changed to Drilled and Cased
1994-04-10 Production Casing Operation Performed
1994-04-10 Rig Released
1994-04-21 Well Log Performed
1994-05-04 Well Log Performed
1994-05-14 Perforation Treatment Performed - Jet Perforation
1994-05-14 Well Log Performed
1994-06-04 Well Began Production
1994-06-04 Well Fluid changed to Crude Oil
1994-06-04 Well Mode changed to Flowing
1997-02-06 Perforation Treatment Performed - Jet Perforation
1997-02-06 Well Fluid changed to Crude Oil
1997-02-06 Well Log Performed
1997-02-06 Well Mode changed to Flowing
2002-09-13 Well Fluid changed to Crude Oil
2002-09-13 Well Mode changed to Pumping
2010-08-31 Well Fluid changed to Crude Oil
2010-08-31 Well Mode changed to Suspended
2015-08-23 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2015-08-23 Plug Back Performed
2015-08-23 Well Fluid changed to Crude Oil
2015-08-23 Well Mode changed to Abandoned Zone
2015-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-24 Plug Back Performed
2015-08-25 Perforation Treatment Performed - Cement Plug
2015-08-25 Plug Back Performed
2015-09-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-04-07 200.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-14 Perforation 860.00 862.00 13
1997-02-06 Perforation 849.00 850.50 18
2015-08-23 Packing Dev Cpd w/Res-Gyp Cem 852.00 855.00 0
2015-08-24 Packing Device Capped w/Cement 838.00 846.00 0
2015-08-25 Cement Plug 188.70 194.40 0
2015-08-25 Cement Plug 180.70 188.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 5027 0.0 0.0 0.0
1995 7325 0.0 0.0 0.0
1996 8668 0.0 0.0 0.0
1997 8533 0.0 0.0 0.0
1998 8303 0.0 0.0 0.0
1999 8698 0.0 0.0 0.0
2000 7149 0.0 0.0 0.0
2001 7888 0.0 0.0 0.0
2002 6671 0.0 0.0 0.0
2003 5427 0.0 0.0 0.0
2005 216 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References