X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052508C02

Well Details

Well ID: 0364052508C02
Loading map...
Location: C0/08-25-036-05W4/2
Location Alias: C0/08-25-36-05 W4M
Location Alias 2: C0/08-25-036-05 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 8-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0151983
License Date: 1992-03-13
License Status: Issued
Spud Date: 1992-03-14
Final Drill Date: 1992-03-17
Well Total Depth: 889.00 m
Surface Hole Latitude: 52.120250
Surface Hole Longitude: -110.579613

For data sources see[1][2]

Well History

Date Event
1992-03-13 Obtained License
1992-03-14 Surface Casing Operation Performed
1992-03-15 Direction Drilling Operation Performed - Deviate
1992-03-17 Finished Drilling
1992-03-17 Well Log Performed
1992-03-17 Well Mode changed to Drilled and Cased
1992-03-18 Production Casing Operation Performed
1992-03-18 Rig Released
1992-03-20 Well Log Performed
1992-03-30 Well Log Performed
1992-04-01 Perforation Treatment Performed - Jet Perforation
1992-04-01 Well Log Performed
1992-04-08 Perforation Treatment Performed - Jet Perforation
1997-12-22 Well Log Performed
2002-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-28 Perforation Treatment Performed - Jet Perforation
2002-11-28 Plug Back Performed
2002-11-28 Well Log Performed
2002-11-30 Perforation Treatment Performed - Fractured
2002-12-06 Well Began Production
2002-12-06 Well Fluid changed to Crude Oil
2002-12-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-03-15 145.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-01 Perforation 867.00 868.80 19
1992-04-08 Perforation 867.00 868.80 19
2002-11-28 Packing Device Capped w/Cement 853.00 861.00 0
2002-11-28 Perforation 807.00 815.50 14
2002-11-30 Fracture 807.00 815.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 610 0.0 0.0 0.0
2003 7881 0.0 0.0 0.0
2004 8258 0.0 0.0 0.0
2005 8723 0.0 0.0 0.0
2006 8116 0.0 0.0 0.0
2007 8067 0.0 0.0 0.0
2008 8777 0.0 0.0 0.0
2009 8650 0.0 0.0 0.0
2010 8630 0.0 0.0 0.0
2011 8708 0.0 0.0 0.0
2012 8708 0.0 0.0 0.0
2013 8712 0.0 0.0 0.0
2014 8241 0.0 0.0 0.0
2015 8740 0.0 0.0 0.0
2016 8650 0.0 0.0 0.0
2017 8645 0.0 0.0 0.0
2018 7326 0.0 0.0 0.0
2019 8125 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[6]

References