X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052507B00

Well Details

Well ID: 0364052507B00
Loading map...
Location: B0/07-25-036-05W4/0
Location Alias: B0/07-25-36-05 W4M
Location Alias 2: B0/07-25-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 7-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0147740
License Date: 1991-01-31
License Status: Suspension
Spud Date: 1991-02-18
Final Drill Date: 1991-02-21
Well Total Depth: 870.00 m
Surface Hole Latitude: 52.118388
Surface Hole Longitude: -110.586632

For data sources see[1][2]

Well History

Date Event
1991-01-31 Obtained License
1991-02-19 Surface Casing Operation Performed
1991-02-21 Finished Drilling
1991-02-21 Production Casing Operation Performed
1991-02-21 Rig Released
1991-02-21 Well Log Performed
1991-02-21 Well Mode changed to Drilled and Cased
1991-03-09 Perforation Treatment Performed - Jet Perforation
1991-03-09 Well Log Performed
1991-03-21 Well Began Production
1991-03-21 Well Fluid changed to Crude Oil
1991-03-21 Well Mode changed to Pumping
1992-06-22 Perforation Treatment Performed - Jet Perforation
1992-06-23 Perforation Treatment Performed - Cement Squeeze
1992-06-26 Perforation Treatment Performed - Jet Perforation
1992-06-30 Perforation Treatment Performed - Jet Perforation
2011-08-31 Well Fluid changed to Crude Oil
2011-08-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-09 Perforation 843.00 844.40 19
1992-06-22 Perforation 847.00 847.80 13
1992-06-23 Cement Squeeze 843.00 847.80 0
1992-06-26 Perforation 843.00 844.50 17
1992-06-30 Perforation 843.90 845.40 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5566 0.0 0.0 0.0
1992 8123 0.0 0.0 0.0
1993 8111 0.0 0.0 0.0
1994 8298 0.0 0.0 0.0
1995 8070 0.0 0.0 0.0
1996 8027 0.0 0.0 0.0
1997 8188 0.0 0.0 0.0
1998 8707 0.0 0.0 0.0
1999 8617 0.0 0.0 0.0
2000 7824 0.0 0.0 0.0
2001 7956 0.0 0.0 0.0
2002 8258 0.0 0.0 0.0
2003 8595 0.0 0.0 0.0
2004 8544 0.0 0.0 0.0
2005 8675 0.0 0.0 0.0
2006 6617 0.0 0.0 0.0
2007 7875 0.0 0.0 0.0
2008 8636 0.0 0.0 0.0
2009 8604 0.0 0.0 0.0
2010 2047 0.0 0.0 0.0

For data sources see[5]

References