X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052501B20

Well Details

Well ID: 0364052501B20
Loading map...
Location: B2/01-25-036-05W4/0
Location Alias: B2/01-25-36-05 W4M
Location Alias 2: B2/01-25-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 25
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 1-25-36-5
Operator Name: Surge Energy Inc.
License Number: 0183472
License Date: 1995-12-14
License Status: Issued
Spud Date: 1995-12-19
Final Drill Date: 1995-12-30
Well Total Depth: 888.00 m
Surface Hole Latitude: 52.114633
Surface Hole Longitude: -110.580490

For data sources see[1][2]

Well History

Date Event
1995-12-14 Obtained License
1995-12-20 Surface Casing Operation Performed
1995-12-28 Direction Drilling Operation Performed - Deviate
1995-12-30 Finished Drilling
1995-12-30 Production Casing Operation Performed
1995-12-30 Well Mode changed to Drilled and Cased
1995-12-31 Rig Released
1995-12-31 Well Log Performed
1996-01-02 Well Log Performed
1996-01-24 Perforation Treatment Performed - Jet Perforation
1996-01-24 Well Log Performed
1996-04-18 Well Began Production
1996-04-18 Well Fluid changed to Crude Oil
1996-04-18 Well Mode changed to Pumping
2008-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-03 Plug Back Performed
2008-07-03 Well Fluid changed to Crude Oil
2008-07-03 Well Mode changed to Abandoned Zone
2008-07-04 Well Log Performed
2008-09-06 Perforation Treatment Performed - Jet Perforation
2008-09-07 Perforation Treatment Performed - Fractured
2008-09-09 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-12-28 338.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-24 Perforation 847.50 849.50 18
2008-07-03 Packing Device Capped w/Cement 830.00 838.00 0
2008-09-06 Perforation 796.00 799.00 17
2008-09-06 Perforation 788.00 793.00 17
2008-09-07 Fracture 788.00 799.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6089 0.0 0.0 0.0
1997 8710 0.0 0.0 0.0
1998 8601 0.0 0.0 0.0
1999 8434 0.0 0.0 0.0
2000 7854 0.0 0.0 0.0
2001 8596 0.0 0.0 0.0
2002 7351 0.0 0.0 0.0
2003 8025 0.0 0.0 0.0
2004 8347 0.0 0.0 0.0
2005 2346 0.0 0.0 0.0

For data sources see[6]

References