X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364052210004

Well Details

Well ID: 0364052210004
Loading map...
Location: 00/10-22-036-05W4/4
Location Alias: 00/10-22-36-05 W4M
Location Alias 2: 00/10-22-036-05 W4/04
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 22
County/Municipality: Special Areas No. 4
Well Name: ACL ET AL PROVOST 10-22-36-5
Operator Name: Battle River Energy Ltd.
License Number: 0078232
License Date: 1979-09-25
License Status: Issued
Spud Date: 1979-09-27
Final Drill Date: 1979-10-04
Well Total Depth: 948.00 m
Surface Hole Latitude: 52.108546
Surface Hole Longitude: -110.631818

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-25 Obtained License
1979-10-04 Finished Drilling
1979-10-04 Well Log Performed
1979-10-04 Well Mode changed to Drilled and Cased
1979-10-05 Drill Stem Test Performed
1979-10-06 Production Casing Operation Performed
1979-11-08 Perforation Treatment Performed - Jet Perforation
1979-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-16 Perforation Treatment Performed - Cement Squeeze
1979-11-17 Perforation Treatment Performed - Jet Perforation
1979-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-16 Perforation Treatment Performed - Jet Perforation
1984-08-30 Perforation Treatment Performed - Cement Squeeze
1992-07-26 Perforation Treatment Performed - Jet Perforation
1997-01-31 Perforation Treatment Performed - Cement Squeeze
1997-01-31 Plug Back Performed
1997-02-08 Perforation Treatment Performed - Jet Perforation
1997-02-08 Well Log Performed
2006-12-12 Well Log Performed
2006-12-13 Well Log Performed
2006-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-14 Perforation Treatment Performed - Jet Perforation
2006-12-14 Plug Back Performed
2006-12-15 Perforation Treatment Performed - Fractured
2007-01-17 Well Began Production
2007-01-17 Well Fluid changed to Gas
2007-01-17 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-08 Perforation 860.00 861.50 5
1984-08-30 Cement Squeeze 850.00 854.00 0
1992-07-26 Perforation 805.00 807.00 13
1997-01-31 Cement Squeeze 805.00 807.00 0
1997-02-08 Perforation 910.00 911.00 13
2006-12-14 Packing Device Capped w/Cement 889.00 897.00 0
2006-12-14 Packing Device Capped w/Cement 792.00 800.00 0
2006-12-14 Perforation 754.00 756.00 17
2006-12-15 Fracture 754.00 756.00 0
1979-11-08 Perforation 863.50 866.00 4
1979-11-08 Perforation 867.50 868.50 7
1979-11-13 Acid Treatment 860.00 868.50 0
1979-11-16 Cement Squeeze 860.00 868.50 0
1979-11-17 Perforation 850.00 851.00 10
1979-11-17 Perforation 852.00 854.00 7
1979-11-23 Acid Treatment 850.00 854.00 0
1980-06-16 Perforation 910.00 911.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 8210 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 8640 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8423 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8279 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 8304 0.0 0.0 0.0
2017 8327 0.0 0.0 0.0
2018 8255 0.0 0.0 0.0
2019 8040 0.0 0.0 0.0
2020 1608 0.0 0.0 0.0

For data sources see[5]

References