If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364051504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.087733,"lon":-110.643009,"icon":""}]} |
Location: 00/04-15-036-05W4/0 | |
Location Alias: 00/04-15-36-05 W4M | |
Location Alias 2: 00/04-15-036-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 05 | |
Section: 15 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ACL PROVOST 4-15-36-5 | |
Operator Name: Battle River Energy Ltd. | |
License Number: 0074021 | |
License Date: 1979-01-19 | |
License Status: Abandoned | |
Spud Date: 1979-01-28 | |
Final Drill Date: 1979-02-05 | |
Well Total Depth: 984.00 m | |
Surface Hole Latitude: 52.087733 | |
Surface Hole Longitude: -110.643009 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-01-19 | Obtained License |
1979-02-05 | Finished Drilling |
1979-02-05 | Well Log Performed |
1979-02-05 | Well Mode changed to Drilled and Cased |
1979-02-07 | Production Casing Operation Performed |
1979-05-26 | Perforation Treatment Performed - Jet Perforation |
1979-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-05-29 | Perforation Treatment Performed - Jet Perforation |
1979-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-06-14 | Well Began Production |
1979-06-14 | Well Fluid changed to Crude Oil |
1979-06-14 | Well Mode changed to Pumping |
1979-08-07 | Perforation Treatment Performed - Cement Squeeze |
1979-08-08 | Perforation Treatment Performed - Jet Perforation |
1979-08-10 | Perforation Treatment Performed - Cement Squeeze |
1979-08-10 | Perforation Treatment Performed - Jet Perforation |
1979-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-08-16 | Perforation Treatment Performed - Cement Squeeze |
1979-08-16 | Well Fluid changed to Crude Oil |
1979-08-16 | Well Mode changed to Abandoned Zone |
1999-08-21 | Perforation Treatment Performed - Jet Perforation |
1999-08-21 | Well Log Performed |
1999-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-26 | Plug Back Performed |
1999-09-26 | Well Log Performed |
1999-11-22 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-05-26 | Perforation | 957.50 | 958.50 | 7 |
1979-08-16 | Cement Squeeze | 934.40 | 935.80 | 0 |
1999-08-21 | Perforation | 261.00 | 263.50 | 13 |
1999-09-26 | Packing Device Capped w/Cement | 250.00 | 258.00 | 0 |
1979-05-29 | Packing Device Capped w/Cement | 954.00 | 954.00 | 0 |
1979-05-29 | Perforation | 945.50 | 946.50 | 7 |
1979-05-31 | Acid Treatment | 945.50 | 946.50 | 0 |
1979-08-07 | Cement Squeeze | 945.50 | 946.50 | 0 |
1979-08-08 | Perforation | 945.50 | 946.50 | 7 |
1979-08-10 | Cement Squeeze | 945.50 | 946.50 | 0 |
1979-08-10 | Perforation | 934.40 | 935.80 | 7 |
1979-08-14 | Acid Treatment | 934.40 | 935.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 818 | 0.0 | 0.0 | 0.0 |
For data sources see[5]