X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364050606000

Well Details

Well ID: 0364050606000
Loading map...
Location: 00/06-06-036-05W4/0
Location Alias: 00/06-06-36-05 W4M
Location Alias 2: 00/06-06-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 06
County/Municipality: Special Areas No. 4
Well Name: ACL PROVOST 6-6-36-5
Operator Name: Battle River Energy Ltd.
License Number: 0007362
License Date: 1953-11-19
License Status: Abandoned
Spud Date: 1953-11-27
Final Drill Date: 1953-12-10
Well Total Depth: 813.80 m
Surface Hole Latitude: 52.060669
Surface Hole Longitude: -110.710327

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-11-19 Obtained License
1953-12-07 Drill Stem Test Performed
1953-12-08 Drill Stem Test Performed
1953-12-09 Drill Stem Test Performed
1953-12-10 Finished Drilling
1953-12-11 Production Casing Operation Performed
1953-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-12-13 Perforation Treatment Performed - Jet Perforation
1953-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-12-14 Perforation Treatment Performed - Jet Perforation
1953-12-15 Perforation Treatment Performed - Jet Perforation
1953-12-17 Perforation Treatment Performed - Fractured
1954-09-24 Well Mode changed to Drilled and Cased
1961-09-06 Well Began Production
1961-09-06 Well Fluid changed to Gas
1961-09-06 Well Mode changed to Flowing
1963-11-16 Perforation Treatment Performed - Fractured
2006-10-06 Well Log Performed
2006-10-12 Well Log Performed
2006-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-13 Perforation Treatment Performed - Jet Perforation
2006-10-13 Plug Back Performed
2006-10-13 Well Fluid changed to Gas
2006-10-13 Well Mode changed to Abandoned Zone
2006-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-31 Perforation Treatment Performed - Remedial Casing
2006-11-03 Perforation Treatment Performed - Cement Plug
2006-11-03 Perforation Treatment Performed - Remedial Casing
2006-11-11 Well Log Performed
2006-11-12 Perforation Treatment Performed - Jet Perforation
2006-11-13 Perforation Treatment Performed - Cement Plug
2006-11-13 Perforation Treatment Performed - Remedial Casing
2006-11-23 Well Log Performed
2006-11-24 Perforation Treatment Performed - Jet Perforation
2006-11-25 Perforation Treatment Performed - Cement Plug
2006-11-25 Perforation Treatment Performed - Remedial Casing
2006-11-25 Well Log Performed
2006-11-26 Perforation Treatment Performed - Jet Perforation
2006-11-27 Perforation Treatment Performed - Cement Plug
2006-11-27 Perforation Treatment Performed - Remedial Casing
2007-04-28 Well Abandoned
2007-04-28 Well Fluid changed to Gas
2007-04-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-12-13 Perforation 787.90 794.00 20
2006-10-13 Perforation 237.00 238.00 13
2006-10-13 Perforation 273.50 274.00 13
2006-10-13 Perforation 346.50 347.50 13
2006-10-31 Remedial Casing Cementing 346.50 347.50 0
2006-10-31 Packing Device Capped w/Cement 280.00 343.00 0
2006-11-03 Remedial Casing Cementing 273.50 274.00 0
2006-11-03 Cement Plug 245.00 280.00 0
2006-11-12 Perforation 237.00 238.00 17
2006-11-13 Remedial Casing Cementing 237.00 238.00 0
2006-11-13 Cement Plug 190.00 245.00 0
1953-12-13 Acid Treatment 787.90 794.00 0
2006-11-24 Perforation 183.00 184.00 17
2006-11-25 Remedial Casing Cementing 183.00 184.00 0
2006-11-25 Cement Plug 129.00 184.00 0
2006-11-26 Perforation 121.00 122.00 17
2006-11-27 Remedial Casing Cementing 121.00 122.00 0
2006-11-27 Cement Plug 85.00 122.00 0
1953-12-14 Perforation 788.80 790.70 7
1953-12-14 Acid Treatment 788.80 790.70 0
1953-12-15 Perforation 785.80 789.40 13
1953-12-15 Perforation 794.00 797.70 13
1953-12-17 Fracture 785.80 797.70 0
1963-11-16 Fracture 785.80 797.70 0
2006-10-13 Packing Device Capped w/Cement 766.70 774.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1398 0.0 0.0 0.0
1969 6778 0.0 0.0 0.0
1970 8619 0.0 0.0 0.0
1971 7412 0.0 0.0 0.0
1972 8345 0.0 0.0 0.0
1973 8699 0.0 0.0 0.0
1974 7852 0.0 0.0 0.0
1975 8389 0.0 0.0 0.0
1976 8686 0.0 0.0 0.0
1977 7903 0.0 0.0 0.0
1978 8410 0.0 0.0 0.0
1979 8327 0.0 0.0 0.0
1980 6886 0.0 0.0 0.0
1981 7212 0.0 0.0 0.0
1982 6172 0.0 0.0 0.0
1983 7137 0.0 0.0 0.0
1984 8361 0.0 0.0 0.0
1985 8252 0.0 0.0 0.0
1986 8209 0.0 0.0 0.0
1987 8058 0.0 0.0 0.0
1988 7748 0.0 0.0 0.0
1989 8060 0.0 0.0 0.0
1990 7137 0.0 0.0 0.0
1991 8360 0.0 0.0 0.0
1992 6953 0.0 0.0 0.0
1993 5831 0.0 0.0 0.0
1994 6262 0.0 0.0 0.0
1995 6815 0.0 0.0 0.0
1996 7445 0.0 0.0 0.0
1997 7560 0.0 0.0 0.0
1998 5489 0.0 0.0 0.0
1999 7869 0.0 0.0 0.0
2000 8607 0.0 0.0 0.0
2001 8644 0.0 0.0 0.0
2002 8321 0.0 0.0 0.0
2003 8683 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 5759 0.0 0.0 0.0

For data sources see[5]

References