If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364043012B03 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.123676,"lon":-110.574443,"icon":""}]} |
Location: B0/12-30-036-04W4/3 | |
Location Alias: B0/12-30-36-04 W4M | |
Location Alias 2: B0/12-30-036-04 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 04 | |
Section: 30 | |
County/Municipality: Special Areas No. 4 | |
Well Name: CRESCENT POINT PROVO 12-30-36-4 | |
Operator Name: Surge Energy Inc. | |
License Number: 0150089 | |
License Date: 1991-09-19 | |
License Status: Issued | |
Spud Date: 1991-09-20 | |
Final Drill Date: 1991-09-23 | |
Well Total Depth: 872.00 m | |
Surface Hole Latitude: 52.123676 | |
Surface Hole Longitude: -110.574443 |
Date | Event |
---|---|
1991-09-19 | Obtained License |
1991-09-21 | Direction Drilling Operation Performed - Deviate |
1991-09-21 | Surface Casing Operation Performed |
1991-09-23 | Finished Drilling |
1991-09-23 | Production Casing Operation Performed |
1991-09-23 | Well Log Performed |
1991-09-23 | Well Mode changed to Drilled and Cased |
1991-09-24 | Rig Released |
1991-10-08 | Well Log Performed |
1991-10-09 | Perforation Treatment Performed - Jet Perforation |
1991-10-15 | Well Log Performed |
2001-09-22 | Well Log Performed |
2006-08-21 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2006-08-21 | Plug Back Performed |
2006-09-05 | Perforation Treatment Performed - Jet Perforation |
2006-09-07 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2011-05-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-05-20 | Perforation Treatment Performed - Jet Perforation |
2011-05-20 | Plug Back Performed |
2011-05-20 | Well Log Performed |
2011-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-23 | Well Began Production |
2011-06-23 | Well Fluid changed to Crude Oil |
2011-06-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1991-09-21 | 132.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-10-09 | Perforation | 847.50 | 849.50 | 19 |
2006-08-21 | Packing Dev Cpd w/Res-Gyp Cem | 846.00 | 847.00 | 0 |
2006-09-05 | Perforation | 835.50 | 840.00 | 17 |
2006-09-07 | Bridge Plug, No Cement | 818.00 | 819.00 | 0 |
2011-05-20 | Packing Device Capped w/Cement | 810.00 | 818.00 | 0 |
2011-05-20 | Perforation | 781.20 | 783.30 | 17 |
2011-05-20 | Perforation | 787.00 | 788.50 | 17 |
2011-05-29 | Multi-Stage Fracture | 781.20 | 788.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 4472 | 0.0 | 0.0 | 0.0 |
2012 | 8409 | 0.0 | 0.0 | 0.0 |
2013 | 8730 | 0.0 | 0.0 | 0.0 |
2014 | 8589 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8737 | 0.0 | 0.0 | 0.0 |
2018 | 8718 | 0.0 | 0.0 | 0.0 |
2019 | 8665 | 0.0 | 0.0 | 0.0 |
2020 | 1873 | 0.0 | 0.0 | 0.0 |
For data sources see[6]