X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364041906C00

Well Details

Well ID: 0364041906C00
Loading map...
Location: C0/06-19-036-04W4/0
Location Alias: C0/06-19-36-04 W4M
Location Alias 2: C0/06-19-036-04 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 04
Section: 19
County/Municipality: Special Areas No. 4
Well Name: 935247 ET AL PROVO 6-19-36-4
Operator Name: Surge Energy Inc.
License Number: 0148219
License Date: 1991-03-01
License Status: Suspension
Spud Date: 1991-03-04
Final Drill Date: 1991-03-06
Well Total Depth: 874.00 m
Surface Hole Latitude: 52.105895
Surface Hole Longitude: -110.568753

For data sources see[1][2]

Well History

Date Event
1991-03-01 Obtained License
1991-03-05 Surface Casing Operation Performed
1991-03-06 Finished Drilling
1991-03-06 Well Log Performed
1991-03-06 Well Mode changed to Drilled and Cased
1991-03-07 Production Casing Operation Performed
1991-03-07 Rig Released
1991-03-11 Well Log Performed
1991-03-14 Perforation Treatment Performed - Jet Perforation
1991-03-14 Perforation Treatment Performed - Remedial Casing
1991-03-17 Perforation Treatment Performed - Jet Perforation
1991-03-19 Well Began Production
1991-03-19 Well Fluid changed to Crude Oil
1991-03-19 Well Mode changed to Flowing
1991-11-09 Well Fluid changed to Crude Oil
1991-11-09 Well Mode changed to Pumping
1992-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-10 Perforation Treatment Performed - Jet Perforation
1992-11-10 Plug Back Performed
1992-11-10 Well Fluid changed to Crude Oil
1992-11-10 Well Log Performed
1992-11-10 Well Mode changed to Abandoned Zone
2005-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-21 Perforation Treatment Performed - Jet Perforation
2005-04-21 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2005-04-21 Plug Back Performed
2005-04-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-14 Perforation 315.00 317.00 19
2005-04-21 Perforation 796.00 797.00 17
2005-04-28 Fracture 796.00 807.50 0
1991-03-14 Remedial Casing Cementing 315.00 317.00 0
1991-03-17 Perforation 850.50 851.50 18
1992-11-10 Packing Device Capped w/Cement 848.00 849.00 0
1992-11-10 Perforation 839.50 841.00 17
2005-04-21 Packing Dev Cpd w/Res-Gyp Cem 839.30 842.30 0
2005-04-21 Packing Device Capped w/Cement 827.00 835.00 0
2005-04-21 Perforation 804.00 807.50 17
2005-04-21 Perforation 798.00 801.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 4357 0.0 0.0 0.0
1992 6585 0.0 0.0 0.0

For data sources see[5]

References