If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364031306002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.091437,"lon":-110.304767,"icon":""}]} |
| Location: 00/06-13-036-03W4/2 | |
| Location Alias: 00/06-13-36-03 W4M | |
| Location Alias 2: 00/06-13-036-03 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 13 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: SURGE ENERGY PROVOST 6-13-36-3 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0135567 | |
| License Date: 1988-08-15 | |
| License Status: Suspension | |
| Spud Date: 1988-08-25 | |
| Final Drill Date: 1988-08-27 | |
| Well Total Depth: 847.00 m | |
| Surface Hole Latitude: 52.091437 | |
| Surface Hole Longitude: -110.304767 |
| Date | Event |
|---|---|
| 1988-08-15 | Obtained License |
| 1988-08-25 | Surface Casing Operation Performed |
| 1988-08-27 | Finished Drilling |
| 1988-08-28 | Well Log Performed |
| 1988-08-29 | Drill Stem Test Performed |
| 1988-08-31 | Drill Stem Test Performed |
| 1988-09-01 | Production Casing Operation Performed |
| 1988-09-01 | Rig Released |
| 1988-09-23 | Well Log Performed |
| 1988-09-24 | Perforation Treatment Performed - Jet Perforation |
| 1988-09-26 | Well Log Performed |
| 1988-09-27 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 1988-09-27 | Perforation Treatment Performed - Jet Perforation |
| 1988-09-29 | Well Mode changed to Drilled and Cased |
| 1989-12-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1989-12-27 | Plug Back Performed |
| 1989-12-27 | Well Log Performed |
| 1989-12-27 | Well Mode changed to Drilled and Cased |
| 1992-11-10 | Perforation Treatment Performed - Jet Perforation |
| 1992-11-10 | Well Log Performed |
| 1992-11-10 | Well Mode changed to Drilled and Cased |
| 1992-12-04 | Well Began Production |
| 1992-12-04 | Well Fluid changed to Gas |
| 1992-12-04 | Well Mode changed to Flowing |
| 1994-11-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-11-19 | Perforation Treatment Performed - Jet Perforation |
| 1994-11-19 | Plug Back Performed |
| 1994-11-19 | Well Fluid changed to Gas |
| 1994-11-19 | Well Log Performed |
| 1994-11-19 | Well Mode changed to Abandoned Zone |
| 1994-11-20 | Perforation Treatment Performed - Cement Squeeze |
| 1994-11-22 | Perforation Treatment Performed - Jet Perforation |
| 1994-11-22 | Well Log Performed |
| 1994-11-23 | Perforation Treatment Performed - Remedial Casing |
| 1994-11-26 | Perforation Treatment Performed - Jet Perforation |
| 1994-11-26 | Well Log Performed |
| 1998-02-02 | Perforation Treatment Performed - Jet Perforation |
| 2012-12-07 | Well Log Performed |
| 2012-12-13 | Well Log Performed |
| 2014-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-10-09 | Plug Back Performed |
| 2014-10-14 | Well Log Performed |
| 2014-12-06 | Perforation Treatment Performed - Cement Plug |
| 2014-12-06 | Perforation Treatment Performed - Cement Squeeze |
| 2014-12-06 | Plug Back Performed |
| 2014-12-07 | Perforation Treatment Performed - Jet Perforation |
| 2014-12-10 | Perforation Treatment Performed - Cement Plug |
| 2014-12-10 | Perforation Treatment Performed - Remedial Casing |
| 2014-12-11 | Perforation Treatment Performed - Jet Perforation |
| 2014-12-11 | Well Log Performed |
| 2014-12-12 | Perforation Treatment Performed - Cement Plug |
| 2014-12-12 | Perforation Treatment Performed - Remedial Casing |
| 2014-12-13 | Perforation Treatment Performed - Cement Plug |
| 2014-12-13 | Perforation Treatment Performed - Jet Perforation |
| 2014-12-13 | Perforation Treatment Performed - Remedial Casing |
| 2014-12-13 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1988-09-24 | Perforation | 816.50 | 817.50 | 13 |
| 1994-11-22 | Perforation | 731.00 | 732.00 | 13 |
| 1994-11-23 | Remedial Casing Cementing | 725.00 | 732.00 | 0 |
| 1994-11-26 | Perforation | 732.50 | 734.50 | 14 |
| 1998-02-02 | Perforation | 797.00 | 799.50 | 13 |
| 2014-10-09 | Packing Device Capped w/Cement | 780.00 | 788.00 | 0 |
| 2014-10-09 | Packing Device Capped w/Cement | 806.00 | 814.00 | 0 |
| 2014-12-06 | Cement Plug | 688.10 | 779.00 | 0 |
| 2014-12-06 | Cement Squeeze | 732.50 | 734.50 | 0 |
| 2014-12-07 | Perforation | 353.00 | 356.00 | 17 |
| 2014-12-07 | Perforation | 309.00 | 312.00 | 17 |
| 1988-09-27 | Bridge Plug, No Cement | 814.00 | 814.00 | 0 |
| 2014-12-10 | Cement Plug | 286.60 | 376.70 | 0 |
| 2014-12-10 | Remedial Casing Cementing | 309.00 | 356.00 | 0 |
| 2014-12-11 | Perforation | 271.00 | 274.00 | 17 |
| 2014-12-12 | Cement Plug | 255.30 | 286.50 | 0 |
| 2014-12-12 | Remedial Casing Cementing | 271.00 | 274.00 | 0 |
| 2014-12-13 | Perforation | 251.00 | 254.00 | 17 |
| 2014-12-13 | Cement Plug | 224.60 | 255.30 | 0 |
| 2014-12-13 | Remedial Casing Cementing | 251.00 | 254.00 | 0 |
| 1988-09-27 | Perforation | 797.00 | 799.50 | 13 |
| 1989-12-27 | Packing Device Capped w/Cement | 814.00 | 814.00 | 0 |
| 1992-11-10 | Perforation | 732.50 | 734.50 | 13 |
| 1994-11-19 | Packing Device Capped w/Cement | 774.00 | 782.00 | 0 |
| 1994-11-19 | Perforation | 736.50 | 737.50 | 13 |
| 1994-11-20 | Cement Squeeze | 732.50 | 737.50 | 0 |
| 1994-11-22 | Perforation | 725.00 | 726.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1992 | 646 | 0.0 | 0.0 | 0.0 |
| 1993 | 8617 | 0.0 | 0.0 | 0.0 |
| 1994 | 2755 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1998-02-05 | No Incident Encountered | 0.00 | 0.00 |
| 2014-12-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]