If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364013306042 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.132396,"lon":-110.101695,"icon":""}]} |
Location: 04/06-33-036-01W4/2 | |
Location Alias: 04/06-33-36-01 W4M | |
Location Alias 2: 04/06-33-036-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 01 | |
Section: 33 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: Caltex_Res PROVOST 6-33-36-1 | |
Operator Name: Caltex Resources Ltd. | |
License Number: 0180359 | |
License Date: 1995-08-29 | |
License Status: Amended | |
Spud Date: 1995-10-03 | |
Final Drill Date: 1995-10-11 | |
Well Total Depth: 1489.00 m | |
Surface Hole Latitude: 52.132396 | |
Surface Hole Longitude: -110.101695 |
Date | Event |
---|---|
1995-08-29 | Obtained License |
1995-10-04 | Surface Casing Operation Performed |
1995-10-05 | Direction Drilling Operation Performed - Horizontal |
1995-10-08 | Intermediate Casing Operation Performed |
1995-10-11 | Finished Drilling |
1995-10-11 | Lost Circulation Occurred |
1995-10-11 | Well Mode changed to Drilled and Cased |
1995-10-13 | Liner Casing Operation Performed |
1995-10-14 | Perforation Treatment Performed - Open-Hole Completion |
1995-10-14 | Perforation Treatment Performed - Slotted Liner or Casing |
1995-10-14 | Rig Released |
1995-10-18 | Well Log Performed |
1995-10-20 | Well Log Performed |
2017-04-25 | Perforation Treatment Performed - Jet Perforation |
2017-05-16 | Well Began Production |
2017-05-16 | Well Fluid changed to Water |
2017-05-16 | Well Type changed to Source |
2018-08-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-10-05 | 505.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-10-14 | Slotted Liner | 910.60 | 1481.00 | 0 |
1995-10-14 | Open Hole/Barefoot Completion | 1481.00 | 1489.00 | 0 |
2017-04-25 | Perforation | 174.00 | 193.00 | 20 |
2018-08-17 | Acid Treatment | 174.00 | 193.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2278 | 0.0 | 0.0 | 0.0 |
2018 | 8333 | 0.0 | 0.0 | 0.0 |
2019 | 8422 | 0.0 | 0.0 | 0.0 |
2020 | 1919 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1995-10-11 | Lost Circulation | 1445.00 | 1489.00 |
2017-05-16 | No Incident Encountered | 0.00 | 0.00 |
2018-08-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]