X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355072909002

Well Details

Well ID: 0355072909002
Loading map...
Location: 00/09-29-035-07W5/2
Location Alias: 00/09-29-35-07 W5M
Location Alias 2: 00/09-29-035-07 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 29
County/Municipality: Clearwater County
Well Name: SHININGBANK CAROLINE 9-29-35-7
Operator Name: TAQA North Ltd.
License Number: 0057505
License Date: 1976-03-11
License Status: Suspension
Spud Date: 1976-03-16
Final Drill Date: 1976-04-30
Well Total Depth: 2863.90 m
Surface Hole Latitude: 52.038099
Surface Hole Longitude: -114.957988

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-11 Obtained License
1976-03-24 Lost Circulation Occurred
1976-04-02 Lost Circulation Occurred
1976-04-16 Liner Casing Operation Performed
1976-04-30 Finished Drilling
1976-04-30 Well Mode changed to Drilled and Cased
1976-08-06 Perforation Treatment Performed - Jet Perforation
1976-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-02 Perforation Treatment Performed - Jet Perforation
1976-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-09 Perforation Treatment Performed - Fractured
1976-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-20 Perforation Treatment Performed - Jet Perforation
1976-09-22 Perforation Treatment Performed - Fractured
1977-02-09 Well Began Production
1977-02-09 Well Fluid changed to Crude Oil
1977-02-09 Well Mode changed to Pumping
1978-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-05 Plug Back Performed
1978-07-05 Well Fluid changed to Crude Oil
1978-07-05 Well Mode changed to Abandoned Zone
1991-02-21 Perforation Treatment Performed - Chemical Squeeze
1991-02-22 Perforation Treatment Performed - Chemical Squeeze
1991-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-06 Perforation 2832.20 2833.10 7
1976-09-22 Fracture 2564.30 2565.80 0
1978-07-05 Packing Device Capped w/Cement 2809.00 2827.00 0
1991-02-21 Chemical Squeeze 2564.30 2565.80 0
1991-02-22 Chemical Squeeze 2564.30 2565.80 0
1991-02-23 Acid Treatment 2564.30 2565.80 0
1976-08-06 Perforation 2834.90 2836.50 7
1976-08-07 Acid Treatment 2832.20 2836.50 0
1976-09-02 Perforation 2832.20 2833.10 7
1976-09-02 Perforation 2834.90 2836.50 7
1976-09-03 Acid Treatment 2832.20 2836.50 0
1976-09-09 Fracture 2832.20 2836.50 0
1976-09-20 Perforation 2564.30 2565.80 7
1976-09-20 Acid Treatment 2564.30 2565.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6259 0.0 0.0 0.0
1978 2330 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-03-24 Lost Circulation 1290.80 1941.80
1976-04-02 Lost Circulation 1941.50 2547.50

For data sources see[6]

References