X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355072313003

Well Details

Well ID: 0355072313003
Loading map...
Location: 00/13-23-035-07W5/3
Location Alias: 00/13-23-35-07 W5M
Location Alias 2: 00/13-23-035-07 W5/03
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 23
County/Municipality: Clearwater County
Well Name: AMOCO CAROLINE 13-23-35-7
Operator Name: TAQA North Ltd.
License Number: 0093944
License Date: 1981-12-15
License Status: Suspension
Spud Date: 1981-12-23
Final Drill Date: 1982-03-01
Well Total Depth: 3100.00 m
Surface Hole Latitude: 52.024827
Surface Hole Longitude: -114.900567

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-12-15 Obtained License
1981-12-23 Lost Circulation Occurred
1982-02-14 Lost Circulation Occurred
1982-03-01 Finished Drilling
1982-03-01 Well Mode changed to Drilled and Cased
1982-03-27 Perforation Treatment Performed - Jet Perforation
1982-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-04-05 Perforation Treatment Performed - Jet Perforation
1982-04-13 Perforation Treatment Performed - Fractured
1982-04-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-02 Perforation Treatment Performed - Jet Perforation
1988-03-15 Perforation Treatment Performed - Jet Perforation
1988-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-17 Perforation Treatment Performed - Jet Perforation
1988-03-29 Well Began Production
1988-03-29 Well Fluid changed to Crude Oil
1988-03-29 Well Mode changed to Flowing
1997-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-17 Perforation Treatment Performed - Remedial Casing
1998-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-04-01 Well Fluid changed to Crude Oil
2015-04-01 Well Mode changed to Pumping
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-27 Perforation 2990.50 2992.00 13
1982-05-02 Perforation 2749.00 2751.50 13
1988-03-15 Perforation 2498.00 2499.00 7
1988-03-16 Acid Treatment 2498.00 2499.00 0
1988-03-17 Perforation 2486.00 2489.00 39
1997-11-29 Acid Treatment 2486.00 2489.00 0
1998-03-17 Remedial Casing Cementing 2498.00 2499.00 0
1998-03-29 Acid Treatment 2486.00 2499.00 0
1982-03-27 Perforation 2993.50 2995.00 13
1982-03-27 Perforation 3001.00 3003.00 13
1982-04-01 Acid Treatment 2990.50 3003.00 0
1982-04-03 Packing Device Capped w/Cement 2985.60 2988.50 0
1982-04-05 Perforation 2966.00 2974.00 13
1982-04-13 Fracture 2966.00 2974.00 0
1982-04-30 Packing Device Capped w/Cement 2901.50 2901.50 0
1982-05-02 Perforation 2744.00 2746.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 3317 0.0 0.0 0.0
1989 3460 0.0 0.0 0.0
1990 2787 0.0 0.0 0.0
1991 3801 0.0 0.0 0.0
1992 7115 0.0 0.0 0.0
1993 8710 0.0 0.0 0.0
1994 8699 0.0 0.0 0.0
1995 8723 0.0 0.0 0.0
1996 8771 0.0 0.0 0.0
1997 8592 0.0 0.0 0.0
1998 8081 0.0 0.0 0.0
1999 8306 0.0 0.0 0.0
2000 8048 0.0 0.0 0.0
2001 7920 0.0 0.0 0.0
2002 8317 0.0 0.0 0.0
2003 7774 0.0 0.0 0.0
2004 7845 0.0 0.0 0.0
2005 8277 0.0 0.0 0.0
2006 7525 0.0 0.0 0.0
2007 8494 0.0 0.0 0.0
2008 7236 0.0 0.0 0.0
2009 4819 0.0 0.0 0.0
2010 3426 0.0 0.0 0.0
2011 3804 0.0 0.0 0.0
2012 3641 0.0 0.0 0.0
2013 3383 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-12-23 Lost Circulation 85.00 85.00
1982-02-14 Lost Circulation 2812.00 2812.00

For data sources see[6]

References