X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355062212020

Well Details

Well ID: 0355062212020
Loading map...
Location: 02/12-22-035-06W5/0
Location Alias: 02/12-22-35-06 W5M
Location Alias 2: 02/12-22-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 22
County/Municipality: Clearwater County
Well Name: PWEI 102 CAROLINE 12-22-35-6
Operator Name: TAQA North Ltd.
License Number: 0085324
License Date: 1980-08-29
License Status: Suspension
Spud Date: 1980-09-27
Final Drill Date: 1980-11-07
Well Total Depth: 2663.00 m
Surface Hole Latitude: 52.023830
Surface Hole Longitude: -114.781684

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-29 Obtained License
1980-11-07 Finished Drilling
1980-11-07 Well Mode changed to Drilled and Cased
1980-11-09 Production Casing Operation Performed
1980-12-12 Perforation Treatment Performed - Jet Perforation
1980-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-22 Well Log Performed
1981-02-01 Well Began Production
1981-02-01 Well Fluid changed to Crude Oil
1981-02-01 Well Mode changed to Pumping
1997-05-01 Well Fluid changed to Crude Oil
1997-05-01 Well Mode changed to Suspended
1997-09-09 Well Fluid changed to Crude Oil
1997-09-09 Well Mode changed to Pumping
2006-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-07-28 Well Fluid changed to Crude Oil
2009-07-28 Well Mode changed to Suspended
2011-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-25 Plug Back Performed
2011-09-25 Well Fluid changed to Crude Oil
2011-09-25 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-12 Perforation 2614.00 2616.00 4
1980-12-12 Perforation 2617.50 2618.50 4
1980-12-12 Perforation 2620.00 2623.00 4
1980-12-15 Acid Treatment 2614.00 2623.00 0
2006-01-22 Acid Treatment 2614.00 2623.00 0
2011-09-25 Packing Device Capped w/Cement 2600.00 2608.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 6443 0.0 0.0 0.0
1982 6019 0.0 0.0 0.0
1983 6228 0.0 0.0 0.0
1984 8160 0.0 0.0 0.0
1985 8198 0.0 0.0 0.0
1986 8387 0.0 0.0 0.0
1987 7967 0.0 0.0 0.0
1988 8084 0.0 0.0 0.0
1989 7847 0.0 0.0 0.0
1990 8704 0.0 0.0 0.0
1991 8420 0.0 0.0 0.0
1992 7707 0.0 0.0 0.0
1993 8099 0.0 0.0 0.0
1994 6924 0.0 0.0 0.0
1995 5677 0.0 0.0 0.0
1996 708 0.0 0.0 0.0
1997 2112 0.0 0.0 0.0
1998 2112 0.0 0.0 0.0
1999 4056 0.0 0.0 0.0
2000 1344 0.0 0.0 0.0

For data sources see[5]

References