X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355061804002

Well Details

Well ID: 0355061804002
Loading map...
Location: 00/04-18-035-06W5/2
Location Alias: 00/04-18-35-06 W5M
Location Alias 2: 00/04-18-035-06 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 18
County/Municipality: Clearwater County
Well Name: PWEI CAROLINE 4-18-35-6
Operator Name: TAQA North Ltd.
License Number: 0055113
License Date: 1975-09-25
License Status: RecCertified
Spud Date: 1975-09-28
Final Drill Date: 1975-10-21
Well Total Depth: 2773.70 m
Surface Hole Latitude: 52.001374
Surface Hole Longitude: -114.853353

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-25 Obtained License
1975-10-21 Finished Drilling
1975-10-21 Well Mode changed to Drilled and Cased
1975-10-23 Production Casing Operation Performed
1975-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-25 Perforation Treatment Performed - Jet Perforation
1975-10-26 Perforation Treatment Performed - Fractured
1977-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-06-30 Perforation Treatment Performed - Jet Perforation
1977-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-07 Perforation Treatment Performed - Fractured
1977-07-08 Well Began Production
1977-07-08 Well Fluid changed to Crude Oil
1977-07-08 Well Mode changed to Pumping
1983-06-01 Well Fluid changed to Crude Oil
1983-06-01 Well Mode changed to Suspended
1995-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-10 Perforation Treatment Performed - Jet Perforation
1995-08-10 Plug Back Performed
1995-08-10 Well Log Performed
1995-08-29 Perforation Treatment Performed - Remedial Casing
1995-09-01 Well Abandoned
1995-09-01 Well Fluid changed to Crude Oil
1995-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-25 Perforation 2727.40 2729.80 13
1995-08-10 Packing Device Capped w/Cement 2400.00 2408.00 0
1995-08-10 Perforation 600.00 601.00 10
1995-08-29 Remedial Casing Cementing 600.00 601.00 0
1975-10-25 Perforation 2732.20 2733.10 13
1975-10-25 Acid Treatment 2727.40 2733.10 0
1975-10-26 Fracture 2727.40 2733.10 0
1977-06-29 Packing Device Capped w/Cement 2709.70 2718.80 0
1977-06-30 Perforation 2428.00 2429.00 13
1977-06-30 Perforation 2430.50 2431.40 13
1977-07-05 Acid Treatment 2428.00 2431.40 0
1977-07-07 Fracture 2428.00 2431.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 3497 0.0 0.0 0.0
1978 7517 0.0 0.0 0.0
1979 7948 0.0 0.0 0.0
1980 6312 0.0 0.0 0.0
1981 4200 0.0 0.0 0.0
1982 5880 0.0 0.0 0.0

For data sources see[5]

References