X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355061604000

Well Details

Well ID: 0355061604000
Loading map...
Location: 00/04-16-035-06W5/0
Location Alias: 00/04-16-35-06 W5M
Location Alias 2: 00/04-16-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 16
County/Municipality: Clearwater County
Well Name: PWEI ET AL CAROLINE 4-16-35-6
Operator Name: TAQA North Ltd.
License Number: 0053959
License Date: 1975-06-20
License Status: Suspension
Spud Date: 1975-07-04
Final Drill Date: 1975-08-07
Well Total Depth: 2712.70 m
Surface Hole Latitude: 52.002629
Surface Hole Longitude: -114.806978

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-20 Obtained License
1975-08-07 Finished Drilling
1975-08-07 Well Mode changed to Drilled and Cased
1975-08-08 Production Casing Operation Performed
1975-08-28 Perforation Treatment Performed - Jet Perforation
1975-08-29 Perforation Treatment Performed - Fractured
1975-09-16 Well Began Production
1975-09-16 Well Fluid changed to Crude Oil
1975-09-16 Well Mode changed to Pumping
1991-09-30 Well Fluid changed to Crude Oil
1991-09-30 Well Mode changed to Suspended
1998-01-23 Well Fluid changed to Crude Oil
1998-01-23 Well Mode changed to Pumping
2006-12-06 Well Fluid changed to Crude Oil
2006-12-06 Well Mode changed to Suspended
2011-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-23 Plug Back Performed
2011-10-23 Well Fluid changed to Crude Oil
2011-10-23 Well Log Performed
2011-10-23 Well Mode changed to Abandoned Zone
2011-10-24 Well Fluid changed to Crude Oil
2011-10-24 Well Mode changed to Pumping
2011-12-01 Well Fluid changed to Crude Oil
2011-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-28 Perforation 2677.40 2679.20 13
1975-08-28 Perforation 2680.40 2681.90 13
1975-08-28 Perforation 2683.50 2685.30 13
1975-08-29 Fracture 2677.40 2685.30 0
2011-10-23 Packing Device Capped w/Cement 2664.00 2672.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 2516 0.0 0.0 0.0
1976 8411 0.0 0.0 0.0
1977 7704 0.0 0.0 0.0
1978 8261 0.0 0.0 0.0
1979 4414 0.0 0.0 0.0
1980 8255 0.0 0.0 0.0
1981 7418 0.0 0.0 0.0
1982 6760 0.0 0.0 0.0
1983 1200 0.0 0.0 0.0
1984 8531 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8635 0.0 0.0 0.0
1987 8711 0.0 0.0 0.0
1988 4440 0.0 0.0 0.0
1989 744 0.0 0.0 0.0
1990 2212 0.0 0.0 0.0
1991 2469 0.0 0.0 0.0
1998 5869 0.0 0.0 0.0
1999 4967 0.0 0.0 0.0
2000 960 0.0 0.0 0.0
2011 528 0.0 0.0 0.0

For data sources see[5]

References