X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355060504000

Well Details

Well ID: 0355060504000
Loading map...
Location: 00/04-05-035-06W5/0
Location Alias: 00/04-05-35-06 W5M
Location Alias 2: 00/04-05-035-06 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 05
County/Municipality: Clearwater County
Well Name: PWEI CAROLINE 4-5-35-6
Operator Name: TAQA North Ltd.
License Number: 0079047
License Date: 1979-11-05
License Status: Suspension
Spud Date: 1979-11-13
Final Drill Date: 1980-01-04
Well Total Depth: 3060.00 m
Surface Hole Latitude: 51.973104
Surface Hole Longitude: -114.829174

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-05 Obtained License
1980-01-04 Finished Drilling
1980-01-04 Well Log Performed
1980-01-07 Production Casing Operation Performed
1980-02-04 Perforation Treatment Performed - Jet Perforation
1980-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-08 Perforation Treatment Performed - Jet Perforation
1980-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-19 Perforation Treatment Performed - Cement Squeeze
1980-02-22 Perforation Treatment Performed - Jet Perforation
1980-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-29 Perforation Treatment Performed - Fractured
1980-08-07 Perforation Treatment Performed - Jet Perforation
1980-08-08 Perforation Treatment Performed - Cement Squeeze
1980-08-13 Perforation Treatment Performed - Jet Perforation
1980-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-20 Perforation Treatment Performed - Cement Squeeze
1980-09-04 Perforation Treatment Performed - Jet Perforation
1980-09-08 Well Mode changed to Drilled and Cased
1980-09-09 Perforation Treatment Performed - Fractured
1980-09-14 Perforation Treatment Performed - Jet Perforation
1981-12-19 Well Began Production
1981-12-19 Well Fluid changed to Gas
1981-12-19 Well Mode changed to Flowing
1991-12-04 Perforation Treatment Performed - Jet Perforation
1991-12-04 Well Log Performed
1991-12-07 Perforation Treatment Performed - Fractured
1991-12-12 Well Log Performed
2002-07-01 Well Fluid changed to Gas
2002-07-01 Well Mode changed to Suspended
2002-09-24 Well Fluid changed to Gas
2002-09-24 Well Mode changed to Flowing
2003-02-01 Well Fluid changed to Gas
2003-02-01 Well Mode changed to Pumping
2018-11-01 Well Fluid changed to Gas
2018-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-04 Perforation 3002.50 3003.00 14
1980-02-26 Acid Treatment 2978.50 2985.00 0
1980-02-29 Fracture 2978.50 2985.00 0
1980-08-07 Perforation 2931.00 2932.00 4
1980-08-08 Cement Squeeze 2931.00 2954.00 0
1980-08-13 Perforation 2939.00 2943.00 4
1980-08-13 Perforation 2953.50 2955.00 7
1980-08-16 Acid Treatment 2939.00 2955.00 0
1980-08-19 Packing Device Capped w/Cement 2958.20 2960.20 0
1980-08-20 Cement Squeeze 2939.00 2955.00 0
1980-09-04 Perforation 2939.00 2943.00 13
1980-02-06 Acid Treatment 3002.50 3003.00 0
1980-09-04 Perforation 2953.50 2955.00 13
1980-09-09 Fracture 2939.00 2955.00 0
1980-09-14 Perforation 2978.50 2985.00 13
1991-12-04 Perforation 2938.00 2948.00 14
1991-12-07 Fracture 2938.00 2955.00 0
1980-02-08 Perforation 2953.50 2954.00 14
1980-02-13 Acid Treatment 3002.50 3003.00 0
1980-02-15 Acid Treatment 2953.50 2954.00 0
1980-02-18 Acid Treatment 2953.50 2954.00 0
1980-02-19 Acid Treatment 3002.50 3003.00 0
1980-02-19 Cement Squeeze 3002.50 3003.00 0
1980-02-22 Perforation 2978.50 2985.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 133 0.0 0.0 0.0
1982 4748 0.0 0.0 0.0
1983 7970 0.0 0.0 0.0
1984 8250 0.0 0.0 0.0
1985 8179 0.0 0.0 0.0
1986 8406 0.0 0.0 0.0
1987 8611 0.0 0.0 0.0
1988 7147 0.0 0.0 0.0
1989 8410 0.0 0.0 0.0
1990 7263 0.0 0.0 0.0
1991 6599 0.0 0.0 0.0
1993 38 0.0 0.0 0.0
1995 24 0.0 0.0 0.0
1996 24 0.0 0.0 0.0
2002 1447 0.0 0.0 0.0
2003 8160 0.0 0.0 0.0
2004 8472 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8522 0.0 0.0 0.0
2007 8544 0.0 0.0 0.0
2008 8377 0.0 0.0 0.0
2009 7435 0.0 0.0 0.0
2010 7524 0.0 0.0 0.0
2011 5935 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8367 0.0 0.0 0.0
2014 8639 0.0 0.0 0.0
2015 7757 0.0 0.0 0.0
2016 8689 0.0 0.0 0.0
2017 746 0.0 0.0 0.0

For data sources see[5]

References