X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355060209002

Well Details

Well ID: 0355060209002
Loading map...
Location: 00/09-02-035-06W5/2
Location Alias: 00/09-02-35-06 W5M
Location Alias 2: 00/09-02-035-06 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 06
Section: 02
County/Municipality: Clearwater County
Well Name: HARVEST CAROL 10-2-35-6
Operator Name: Harvest Operations Corp.
License Number: 0214507
License Date: 1998-04-02
License Status: Amended
Spud Date: 2003-02-20
Final Drill Date: 2003-03-21
Well Total Depth: 4120.00 m
Surface Hole Latitude: 51.979666
Surface Hole Longitude: -114.750450

For data sources see[1][2]

Well History

Date Event
1998-04-02 Obtained License
2003-02-18 Well Log Performed
2003-02-20 Direction Drilling Operation Performed - Deviate
2003-03-11 Well Log Performed
2003-03-21 Finished Drilling
2003-03-21 Well Log Performed
2003-03-21 Well Mode changed to Drilled and Cased
2003-03-22 Well Log Performed
2003-03-23 Well Log Performed
2003-03-24 Well Log Performed
2003-03-25 Liner Casing Operation Performed
2003-03-29 Well Log Performed
2003-04-02 Rig Released
2003-04-14 Perforation Treatment Performed - Jet Perforation
2003-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-16 Well Fluid changed to Gas
2003-04-16 Well Mode changed to Testing
2003-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-22 Perforation Treatment Performed - Jet Perforation
2003-10-01 Well Began Production
2003-10-01 Well Fluid changed to Gas
2003-10-01 Well Mode changed to Flowing
2007-11-15 Well Log Performed
2009-06-18 Well Log Performed
2009-07-25 Well Log Performed
2009-07-26 Well Log Performed
2009-07-27 Well Log Performed
2009-08-09 Well Log Performed
2009-08-20 Perforation Treatment Performed - Cement Squeeze
2009-08-20 Perforation Treatment Performed - Jet Perforation
2009-12-10 Well Log Performed
2009-12-22 Well Log Performed
2009-12-29 Well Log Performed
2015-06-23 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-02-20 2991.80 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-04-14 Perforation 3988.00 3998.00 13
2003-04-16 Acid Treatment 3988.00 3998.00 0
2003-04-22 Perforation 3976.00 3985.00 13
2003-04-22 Acid Treatment 3976.00 3985.00 0
2009-08-20 Perforation 3910.00 3912.00 1
2009-08-20 Cement Squeeze 3910.00 3912.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2144 0.0 0.0 0.0
2004 4361 0.0 0.0 0.0
2005 8708 0.0 0.0 0.0
2006 8127 0.0 0.0 0.0
2007 6110 0.0 0.0 0.0
2008 7740 0.0 0.0 0.0
2009 2922 0.0 0.0 0.0
2010 6456 0.0 0.0 0.0
2011 6626 0.0 0.0 0.0
2012 6682 0.0 0.0 0.0
2013 8512 0.0 0.0 0.0
2014 7992 0.0 0.0 0.0
2015 8612 0.0 0.0 0.0
2016 8539 0.0 0.0 0.0
2017 8503 0.0 0.0 0.0
2018 7824 0.0 0.0 0.0
2019 8657 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[6]

References