X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355050914002

Well Details

Well ID: 0355050914002
Loading map...
Location: 00/14-09-035-05W5/2
Location Alias: 00/14-09-35-05 W5M
Location Alias 2: 00/14-09-035-05 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 09
County/Municipality: Clearwater County
Well Name: CVE CAROL 14-9-35-5
Operator Name: Cenovus Energy Inc.
License Number: 0202008
License Date: 1997-05-30
License Status: Issued
Spud Date: 1997-06-20
Final Drill Date: 1997-07-11
Well Total Depth: 2855.00 m
Surface Hole Latitude: 51.997745
Surface Hole Longitude: -114.657790

For data sources see[1][2]

Well History

Date Event
1997-05-30 Obtained License
1997-06-22 Surface Casing Operation Performed
1997-06-29 Direction Drilling Operation Performed - Deviate
1997-07-07 Kick Occurred
1997-07-11 Finished Drilling
1997-07-11 Well Mode changed to Drilled and Cased
1997-07-12 Well Log Performed
1997-07-14 Production Casing Operation Performed
1997-07-14 Rig Released
1997-07-16 Well Log Performed
1997-08-06 Well Log Performed
1997-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-07 Perforation Treatment Performed - Jet Perforation
1997-08-07 Well Log Performed
1999-08-03 Well Log Performed
1999-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-06 Plug Back Performed
1999-08-06 Well Log Performed
1999-08-09 Perforation Treatment Performed - Jet Perforation
1999-08-10 Perforation Treatment Performed - Fractured
1999-08-10 Well Began Production
1999-08-10 Well Fluid changed to Gas
1999-08-10 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2003-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-29 2051.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-07 Perforation 2794.00 2795.50 17
1997-08-07 Perforation 2797.50 2799.00 17
1997-08-07 Acid Treatment 2794.00 2799.00 0
1999-08-06 Packing Device Capped w/Cement 2782.00 2790.00 0
1999-08-09 Perforation 2726.50 2728.00 17
1999-08-09 Perforation 2732.50 2734.00 17
1999-08-09 Perforation 2741.00 2744.00 17
1999-08-10 Fracture 2726.50 2744.00 0
2003-10-21 Acid Treatment 2726.50 2744.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2929 0.0 0.0 0.0
2000 8444 0.0 0.0 0.0
2001 7495 0.0 0.0 0.0
2002 8246 0.0 0.0 0.0
2003 8478 0.0 0.0 0.0
2004 8409 0.0 0.0 0.0
2005 8553 0.0 0.0 0.0
2006 8207 0.0 0.0 0.0
2007 8543 0.0 0.0 0.0
2008 7679 0.0 0.0 0.0
2009 8447 0.0 0.0 0.0
2010 8255 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8519 0.0 0.0 0.0
2013 8177 0.0 0.0 0.0
2014 7363 0.0 0.0 0.0
2015 8408 0.0 0.0 0.0
2016 8494 0.0 0.0 0.0
2017 7134 0.0 0.0 0.0
2018 1592 0.0 0.0 0.0
2019 1733 0.0 0.0 0.0
2020 424 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-07-07 Kick 2745.00 2745.00

For data sources see[7]

References