X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355050906000

Well Details

Well ID: 0355050906000
Loading map...
Location: 00/06-09-035-05W5/0
Location Alias: 00/06-09-35-05 W5M
Location Alias 2: 00/06-09-035-05 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 09
County/Municipality: Clearwater County
Well Name: PWEI CAROL 6-9-35-5
Operator Name: TAQA North Ltd.
License Number: 0019531
License Date: 1960-08-11
License Status: Issued
Spud Date: 1960-08-14
Final Drill Date: 1960-09-22
Well Total Depth: 2903.20 m
Surface Hole Latitude: 51.989983
Surface Hole Longitude: -114.659089

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-11 Obtained License
1960-08-15 Lost Circulation Occurred
1960-09-06 Drill Stem Test Performed
1960-09-18 Drill Stem Test Performed
1960-09-22 Finished Drilling
1960-09-24 Production Casing Operation Performed
1960-11-06 Well Log Performed
1960-11-08 Perforation Treatment Performed - Jet Perforation
1960-11-11 Perforation Treatment Performed - Jet Perforation
1960-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-13 Perforation Treatment Performed - Fractured
1960-11-19 Perforation Treatment Performed - Cement Squeeze
1960-11-24 Perforation Treatment Performed - Jet Perforation
1960-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-26 Perforation Treatment Performed - Bullet Perforation
1960-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-09 Well Mode changed to Drilled and Cased
1968-01-04 Well Began Production
1968-01-04 Well Fluid changed to Gas
1968-01-04 Well Mode changed to Flowing
1968-09-16 Perforation Treatment Performed - Cement Squeeze
1968-09-19 Perforation Treatment Performed - Jet Perforation
1968-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-21 Perforation Treatment Performed - Cement Squeeze
1968-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-09-22 Perforation Treatment Performed - Cement Squeeze
1968-09-26 Perforation Treatment Performed - Jet Perforation
1968-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-02-01 Well Fluid changed to Gas
1970-02-01 Well Mode changed to Abandoned Zone
1970-02-04 Perforation Treatment Performed - Jet Perforation
1982-06-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-08 Perforation 2733.10 2735.00 7
1960-11-26 Acid Treatment 2790.10 2795.00 0
1960-11-26 Bullet Perforation 2790.10 2795.00 7
1960-11-28 Acid Treatment 2790.10 2795.00 0
1968-09-16 Cement Squeeze 2790.10 2795.00 0
1968-09-19 Perforation 2799.30 2800.20 7
1968-09-20 Acid Treatment 2799.30 2800.20 0
1968-09-21 Cement Squeeze 2799.30 2800.20 0
1968-09-22 Acid Treatment 2790.10 2795.00 0
1968-09-22 Cement Squeeze 2790.10 2795.00 0
1968-09-22 Packing Device Capped w/Cement 2794.70 2798.10 0
1960-11-08 Perforation 2737.10 2740.20 7
1968-09-26 Perforation 2789.50 2790.70 13
1968-09-27 Acid Treatment 2789.50 2790.70 0
1969-01-30 Packing Device Capped w/Cement 2767.60 2775.20 0
1970-02-04 Perforation 2487.80 2488.40 7
1970-02-04 Perforation 2491.40 2492.70 7
1970-02-04 Perforation 2494.50 2497.50 7
1982-06-03 Fracture 2487.80 2497.50 0
1960-11-11 Perforation 2706.60 2709.40 7
1960-11-11 Perforation 2715.20 2722.80 7
1960-11-11 Perforation 2726.40 2728.30 7
1960-11-13 Acid Treatment 2706.60 2740.20 0
1960-11-13 Fracture 2706.60 2740.20 0
1960-11-19 Cement Squeeze 2706.60 2740.20 0
1960-11-24 Perforation 2790.10 2795.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 1056 0.0 0.0 0.0
1970 576 0.0 0.0 0.0
1981 535 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-08-15 Lost Circulation 151.70 151.70

For data sources see[6]

References