If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0355040216002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.98381,"lon":-114.45511,"icon":""}]} |
Location: 00/16-02-035-04W5/2 | |
Location Alias: 00/16-02-35-04 W5M | |
Location Alias 2: 00/16-02-035-04 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 5 | |
Range: 04 | |
Section: 02 | |
County/Municipality: Red Deer County | |
Well Name: BEC GARR 16-2-35-4 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0094102 | |
License Date: 1981-12-23 | |
License Status: RecCertified | |
Spud Date: 1982-01-15 | |
Final Drill Date: 1982-02-12 | |
Well Total Depth: 2590.00 m | |
Surface Hole Latitude: 51.983810 | |
Surface Hole Longitude: -114.455110 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-12-23 | Obtained License |
1982-02-12 | Finished Drilling |
1982-02-15 | Production Casing Operation Performed |
1982-08-07 | Perforation Treatment Performed - Jet Perforation |
1982-08-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-08-17 | Perforation Treatment Performed - Cement Squeeze |
1982-08-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-08-21 | Perforation Treatment Performed - Fractured |
1982-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-09-03 | Perforation Treatment Performed - Jet Perforation |
1982-09-07 | Perforation Treatment Performed - Fractured |
1982-09-21 | Perforation Treatment Performed - Jet Perforation |
1982-09-21 | Well Mode changed to Drilled and Cased |
1982-09-22 | Perforation Treatment Performed - Fractured |
1983-02-03 | Well Began Production |
1983-02-03 | Well Fluid changed to Crude Oil |
1983-02-03 | Well Mode changed to Pumping |
1984-01-01 | Well Fluid changed to Crude Oil |
1984-01-01 | Well Mode changed to Suspended |
1999-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-02-16 | Perforation Treatment Performed - Jet Perforation |
1999-02-16 | Plug Back Performed |
1999-02-19 | Perforation Treatment Performed - Remedial Casing |
1999-02-21 | Well Abandoned |
1999-02-21 | Well Fluid changed to Crude Oil |
1999-02-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-08-07 | Perforation | 2456.00 | 2458.00 | 6 |
1982-09-03 | Packing Device Capped w/Cement | 2445.00 | 2445.00 | 0 |
1982-09-03 | Perforation | 2417.00 | 2425.00 | 13 |
1982-09-07 | Fracture | 2417.00 | 2425.00 | 0 |
1982-09-21 | Perforation | 2210.00 | 2217.50 | 13 |
1982-09-22 | Fracture | 2210.00 | 2217.50 | 0 |
1999-02-16 | Packing Device Capped w/Cement | 2366.00 | 2374.00 | 0 |
1999-02-16 | Packing Device Capped w/Cement | 2192.00 | 2200.00 | 0 |
1999-02-16 | Perforation | 549.50 | 550.50 | 13 |
1999-02-19 | Remedial Casing Cementing | 549.50 | 550.50 | 0 |
1982-08-07 | Perforation | 2473.00 | 2475.00 | 6 |
1982-08-07 | Perforation | 2525.00 | 2532.00 | 6 |
1982-08-07 | Perforation | 2538.00 | 2540.00 | 6 |
1982-08-07 | Perforation | 2544.00 | 2550.00 | 7 |
1982-08-09 | Acid Treatment | 2456.00 | 2550.00 | 0 |
1982-08-17 | Cement Squeeze | 2525.00 | 2550.00 | 0 |
1982-08-19 | Acid Treatment | 2456.00 | 2475.00 | 0 |
1982-08-21 | Fracture | 2456.00 | 2475.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 120 | 0.0 | 0.0 | 0.0 |
1983 | 240 | 0.0 | 0.0 | 0.0 |
For data sources see[5]