If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0355031608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.004103,"lon":-114.362397,"icon":""}]} |
Location: 00/08-16-035-03W5/0 | |
Location Alias: 00/08-16-35-03 W5M | |
Location Alias 2: 00/08-16-035-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 5 | |
Range: 03 | |
Section: 16 | |
County/Municipality: Red Deer County | |
Well Name: CPEC GARR 8-16-35-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0122562 | |
License Date: 1986-02-20 | |
License Status: Abandoned | |
Spud Date: 1986-02-23 | |
Final Drill Date: 1986-03-11 | |
Well Total Depth: 2155.00 m | |
Surface Hole Latitude: 52.004103 | |
Surface Hole Longitude: -114.362397 |
Date | Event |
---|---|
1986-02-20 | Obtained License |
1986-02-25 | Surface Casing Operation Performed |
1986-03-11 | Finished Drilling |
1986-03-11 | Well Mode changed to Drilled and Cased |
1986-03-12 | Well Log Performed |
1986-03-13 | Production Casing Operation Performed |
1986-03-14 | Rig Released |
1986-05-30 | Perforation Treatment Performed - Jet Perforation |
1986-06-06 | Perforation Treatment Performed - Fractured |
1986-06-13 | Well Log Performed |
1986-09-02 | Well Began Production |
1986-09-02 | Well Fluid changed to Crude Oil |
1986-09-02 | Well Mode changed to Pumping |
1996-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-21 | Plug Back Performed |
1996-02-21 | Well Fluid changed to Crude Oil |
1996-02-21 | Well Mode changed to Suspended |
1996-02-22 | Perforation Treatment Performed - Jet Perforation |
1996-02-22 | Well Fluid changed to Crude Oil |
1996-02-22 | Well Mode changed to Abandoned Zone |
1996-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-02-24 | Perforation Treatment Performed - Fractured |
2016-11-17 | Well Log Performed |
2016-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-11-18 | Perforation Treatment Performed - Jet Perforation |
2016-11-18 | Plug Back Performed |
2016-11-18 | Well Log Performed |
2016-11-20 | Perforation Treatment Performed - Cement Plug |
2016-11-20 | Perforation Treatment Performed - Cement Squeeze |
2016-11-20 | Plug Back Performed |
2016-11-21 | Perforation Treatment Performed - Jet Perforation |
2016-11-21 | Well Log Performed |
2016-11-22 | Perforation Treatment Performed - Cement Plug |
2016-11-22 | Perforation Treatment Performed - Cement Squeeze |
2016-11-22 | Plug Back Performed |
2016-11-23 | Perforation Treatment Performed - Jet Perforation |
2016-11-23 | Well Log Performed |
2016-11-24 | Perforation Treatment Performed - Cement Plug |
2016-11-24 | Perforation Treatment Performed - Cement Squeeze |
2016-11-24 | Plug Back Performed |
2016-11-25 | Perforation Treatment Performed - Cement Plug |
2016-11-25 | Perforation Treatment Performed - Cement Squeeze |
2016-11-25 | Perforation Treatment Performed - Jet Perforation |
2016-11-25 | Plug Back Performed |
2016-11-25 | Well Log Performed |
2016-11-27 | Perforation Treatment Performed - Jet Perforation |
2016-11-27 | Well Log Performed |
2016-11-28 | Perforation Treatment Performed - Cement Plug |
2016-11-28 | Perforation Treatment Performed - Cement Squeeze |
2016-11-28 | Plug Back Performed |
2016-11-29 | Perforation Treatment Performed - Jet Perforation |
2016-11-29 | Well Log Performed |
2016-11-30 | Perforation Treatment Performed - Cement Plug |
2016-11-30 | Perforation Treatment Performed - Cement Squeeze |
2016-11-30 | Plug Back Performed |
2016-12-01 | Perforation Treatment Performed - Jet Perforation |
2016-12-01 | Well Log Performed |
2016-12-08 | Perforation Treatment Performed - Cement Plug |
2016-12-08 | Perforation Treatment Performed - Cement Squeeze |
2016-12-08 | Plug Back Performed |
2016-12-09 | Perforation Treatment Performed - Jet Perforation |
2016-12-09 | Well Log Performed |
2016-12-10 | Perforation Treatment Performed - Cement Plug |
2016-12-10 | Perforation Treatment Performed - Cement Squeeze |
2016-12-10 | Perforation Treatment Performed - Jet Perforation |
2016-12-10 | Plug Back Performed |
2016-12-10 | Well Log Performed |
2016-12-11 | Perforation Treatment Performed - Jet Perforation |
2016-12-11 | Well Log Performed |
2016-12-12 | Perforation Treatment Performed - Cement Plug |
2016-12-12 | Perforation Treatment Performed - Cement Squeeze |
2016-12-12 | Plug Back Performed |
2016-12-13 | Perforation Treatment Performed - Jet Perforation |
2016-12-13 | Well Log Performed |
2016-12-14 | Perforation Treatment Performed - Cement Plug |
2016-12-14 | Perforation Treatment Performed - Cement Squeeze |
2016-12-14 | Plug Back Performed |
2016-12-15 | Perforation Treatment Performed - Jet Perforation |
2016-12-15 | Well Log Performed |
2016-12-16 | Perforation Treatment Performed - Cement Plug |
2016-12-16 | Perforation Treatment Performed - Cement Squeeze |
2016-12-16 | Plug Back Performed |
2016-12-19 | Perforation Treatment Performed - Jet Perforation |
2016-12-19 | Well Log Performed |
2016-12-20 | Perforation Treatment Performed - Cement Plug |
2016-12-20 | Perforation Treatment Performed - Cement Squeeze |
2016-12-20 | Plug Back Performed |
2016-12-21 | Perforation Treatment Performed - Jet Perforation |
2016-12-21 | Well Log Performed |
2016-12-22 | Perforation Treatment Performed - Cement Plug |
2016-12-22 | Perforation Treatment Performed - Cement Squeeze |
2016-12-22 | Plug Back Performed |
2016-12-23 | Well Log Performed |
2017-01-04 | Perforation Treatment Performed - Cement Plug |
2017-01-04 | Perforation Treatment Performed - Cement Squeeze |
2017-01-04 | Perforation Treatment Performed - Jet Perforation |
2017-01-04 | Plug Back Performed |
2017-01-04 | Well Log Performed |
2017-11-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-05-30 | Perforation | 2107.00 | 2115.50 | 13 |
2016-11-20 | Cement Plug | 1493.00 | 1503.00 | 0 |
2016-11-21 | Perforation | 1482.00 | 1483.00 | 17 |
2016-11-22 | Cement Squeeze | 1482.00 | 1483.00 | 0 |
2016-11-22 | Cement Plug | 1470.00 | 1478.00 | 0 |
2016-11-23 | Perforation | 1421.00 | 1422.00 | 17 |
2016-11-23 | Perforation | 1396.00 | 1397.00 | 17 |
2016-11-24 | Cement Squeeze | 1396.00 | 1397.00 | 0 |
2016-11-24 | Cement Plug | 1383.50 | 1392.50 | 0 |
2016-11-25 | Perforation | 1123.00 | 1124.00 | 17 |
2016-11-25 | Perforation | 1098.00 | 1099.00 | 17 |
1986-06-06 | Fracture | 2107.00 | 2115.50 | 0 |
2016-11-25 | Cement Squeeze | 1098.00 | 1099.00 | 0 |
2016-11-25 | Cement Plug | 1084.00 | 1093.20 | 0 |
2016-11-27 | Perforation | 1046.00 | 1047.00 | 17 |
2016-11-28 | Cement Squeeze | 1046.00 | 1047.00 | 0 |
2016-11-28 | Cement Plug | 1034.00 | 1043.00 | 0 |
2016-11-29 | Perforation | 904.00 | 905.00 | 17 |
2016-11-30 | Cement Squeeze | 904.00 | 905.00 | 0 |
2016-11-30 | Cement Plug | 889.60 | 897.00 | 0 |
2016-12-01 | Perforation | 828.00 | 829.00 | 17 |
2016-12-08 | Cement Squeeze | 828.00 | 829.00 | 0 |
1996-02-21 | Packing Device Capped w/Cement | 2082.00 | 2090.00 | 0 |
2016-12-08 | Cement Plug | 812.00 | 821.00 | 0 |
2016-12-09 | Perforation | 756.00 | 757.00 | 17 |
2016-12-10 | Perforation | 746.00 | 747.00 | 17 |
2016-12-10 | Cement Squeeze | 746.00 | 747.00 | 0 |
2016-12-10 | Cement Plug | 732.00 | 742.00 | 0 |
2016-12-11 | Perforation | 717.00 | 718.00 | 17 |
2016-12-12 | Cement Squeeze | 717.00 | 718.00 | 0 |
2016-12-12 | Cement Plug | 702.00 | 714.30 | 0 |
2016-12-13 | Perforation | 680.00 | 681.00 | 17 |
2016-12-14 | Cement Squeeze | 680.00 | 681.00 | 0 |
1996-02-22 | Perforation | 1836.00 | 1838.00 | 17 |
2016-12-14 | Cement Plug | 664.00 | 677.00 | 0 |
2016-12-15 | Perforation | 620.00 | 621.00 | 17 |
2016-12-16 | Cement Squeeze | 620.00 | 621.00 | 0 |
2016-12-16 | Cement Plug | 607.50 | 617.50 | 0 |
2016-12-19 | Perforation | 592.00 | 593.00 | 17 |
2016-12-20 | Cement Squeeze | 592.00 | 593.00 | 0 |
2016-12-20 | Cement Plug | 581.00 | 590.00 | 0 |
2016-12-21 | Perforation | 573.00 | 574.00 | 17 |
2016-12-22 | Cement Squeeze | 573.00 | 574.00 | 0 |
2016-12-22 | Cement Plug | 560.00 | 569.70 | 0 |
1996-02-23 | Acid Treatment | 1836.00 | 1838.00 | 0 |
2017-01-04 | Perforation | 350.00 | 351.00 | 17 |
2017-01-04 | Cement Squeeze | 350.00 | 351.00 | 0 |
2017-01-04 | Cement Plug | 337.20 | 346.20 | 0 |
1996-02-24 | Fracture | 1836.00 | 1838.00 | 0 |
2016-11-18 | Packing Device Capped w/Cement | 1822.00 | 1830.00 | 0 |
2016-11-18 | Perforation | 1506.00 | 1507.00 | 17 |
2016-11-20 | Cement Squeeze | 1506.00 | 1507.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 2893 | 0.0 | 0.0 | 0.0 |
1987 | 8666 | 0.0 | 0.0 | 0.0 |
1988 | 8509 | 0.0 | 0.0 | 0.0 |
1989 | 6968 | 0.0 | 0.0 | 0.0 |
1990 | 8159 | 0.0 | 0.0 | 0.0 |
1991 | 8735 | 0.0 | 0.0 | 0.0 |
1992 | 6720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]