X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355030914002

Well Details

Well ID: 0355030914002
Loading map...
Location: 00/14-09-035-03W5/2
Location Alias: 00/14-09-35-03 W5M
Location Alias 2: 00/14-09-035-03 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 03
Section: 09
County/Municipality: Red Deer County
Well Name: CPEC GARR 14-9-35-3
Operator Name: Crescent Point Energy Corp.
License Number: 0097373
License Date: 1982-09-10
License Status: Suspension
Spud Date: 1982-09-12
Final Drill Date: 1982-09-26
Well Total Depth: 2161.00 m
Surface Hole Latitude: 51.998230
Surface Hole Longitude: -114.374741

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-10 Obtained License
1982-09-21 Drill Stem Test Performed
1982-09-26 Finished Drilling
1982-09-26 Well Log Performed
1982-09-26 Well Mode changed to Drilled and Cased
1982-09-27 Production Casing Operation Performed
1982-11-10 Perforation Treatment Performed - Jet Perforation
1982-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-03 Perforation Treatment Performed - Jet Perforation
1983-03-15 Perforation Treatment Performed - Fractured
1983-03-21 Well Began Production
1983-03-21 Well Fluid changed to Crude Oil
1983-03-21 Well Mode changed to Flowing
1988-09-15 Well Fluid changed to Crude Oil
1988-09-15 Well Mode changed to Pumping
1993-12-01 Perforation Treatment Performed - Cement Squeeze
1993-12-01 Well Fluid changed to Crude Oil
1993-12-01 Well Mode changed to Abandoned Zone
1999-12-21 Perforation Treatment Performed - Jet Perforation
1999-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-22 Perforation Treatment Performed - Acid Wash - No Pressure

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-10 Perforation 2115.50 2125.50 13
1982-11-11 Acid Treatment 2115.50 2125.50 0
1983-03-03 Perforation 1846.00 1849.00 13
1983-03-03 Acid Treatment 1846.00 1849.00 0
1983-03-15 Fracture 1846.00 1849.00 0
1993-12-01 Cement Squeeze 1846.00 1849.00 0
1999-12-21 Perforation 1846.00 1849.00 17
1999-12-22 Acid Wash 1846.00 1849.00 0
1999-12-22 Acid Treatment 1846.00 1849.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3921 0.0 0.0 0.0
1984 6958 0.0 0.0 0.0
1985 8242 0.0 0.0 0.0
1986 8449 0.0 0.0 0.0
1987 8351 0.0 0.0 0.0
1988 8663 0.0 0.0 0.0
1989 5772 0.0 0.0 0.0
1993 3440 0.0 0.0 0.0

For data sources see[5]

References