X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355030406000

Well Details

Well ID: 0355030406000
Loading map...
Location: 00/06-04-035-03W5/0
Location Alias: 00/06-04-35-03 W5M
Location Alias 2: 00/06-04-035-03 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 03
Section: 04
County/Municipality: Red Deer County
Well Name: WHITECAP GARR 6-4-35-3
Operator Name: Whitecap Resources Inc.
License Number: 0117076
License Date: 1985-08-19
License Status: Abandoned
Spud Date: 1985-09-04
Final Drill Date: 1985-09-26
Well Total Depth: 2150.00 m
Surface Hole Latitude: 51.976563
Surface Hole Longitude: -114.371349

For data sources see[1][2]

Well History

Date Event
1985-08-19 Obtained License
1985-09-06 Surface Casing Operation Performed
1985-09-26 Finished Drilling
1985-09-26 Well Log Performed
1985-09-26 Well Mode changed to Drilled and Cased
1985-09-28 Production Casing Operation Performed
1985-09-28 Rig Released
1985-10-03 Perforation Treatment Performed - Jet Perforation
1985-10-03 Well Log Performed
1985-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-11 Perforation Treatment Performed - Fractured
1985-11-01 Well Began Production
1985-11-01 Well Fluid changed to Crude Oil
1985-11-01 Well Mode changed to Pumping
1999-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-26 Perforation Treatment Performed - Jet Perforation
1999-08-26 Perforation Treatment Performed - Remedial Casing
1999-08-26 Plug Back Performed
1999-08-26 Well Log Performed
1999-10-14 Well Abandoned
1999-10-14 Well Fluid changed to Crude Oil
1999-10-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-03 Perforation 2108.00 2122.00 26
1985-10-06 Acid Treatment 2108.00 2122.00 0
1985-10-11 Fracture 2108.00 2122.00 0
1999-08-26 Packing Device Capped w/Cement 2095.00 2103.00 0
1999-08-26 Perforation 457.00 458.00 2
1999-08-26 Remedial Casing Cementing 457.00 458.00 0
1999-08-26 Packing Device Capped w/Cement 441.00 453.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1206 0.0 0.0 0.0
1986 4502 0.0 0.0 0.0
1987 3981 0.0 0.0 0.0
1988 4633 0.0 0.0 0.0
1989 7061 0.0 0.0 0.0
1990 7934 0.0 0.0 0.0
1991 8501 0.0 0.0 0.0
1992 7896 0.0 0.0 0.0
1993 8303 0.0 0.0 0.0
1994 7107 0.0 0.0 0.0
1995 7631 0.0 0.0 0.0
1996 6815 0.0 0.0 0.0
1997 5015 0.0 0.0 0.0
1998 528 0.0 0.0 0.0

For data sources see[5]

References