X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355011501002

Well Details

Well ID: 0355011501002
Loading map...
Location: 00/01-15-035-01W5/2
Location Alias: 00/01-15-35-01 W5M
Location Alias 2: 00/01-15-035-01 W5/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 15
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 1-15-35-1
Operator Name: Enhance Energy Inc.
License Number: 0015584
License Date: 1958-07-16
License Status: Amended
Spud Date: 1958-07-19
Final Drill Date: 1993-03-28
Well Total Depth: 3032.00 m
Surface Hole Latitude: 52.000833
Surface Hole Longitude: -114.052350

For data sources see[1][2]

Well History

Date Event
1958-07-16 Obtained License
1958-08-20 Perforation Treatment Performed - Open-Hole Completion
1961-07-15 Perforation Treatment Performed - Open-Hole Completion
1984-09-10 Perforation Treatment Performed - Jet Perforation
1984-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-04-15 Perforation Treatment Performed - Jet Perforation
1988-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-20 Perforation Treatment Performed - Cement Squeeze
1988-04-21 Perforation Treatment Performed - Jet Perforation
1988-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-23 Perforation Treatment Performed - Jet Perforation
1993-03-09 Perforation Treatment Performed - Cement Squeeze
1993-03-28 Finished Drilling
1993-03-28 Perforation Treatment Performed - Open-Hole Completion
1993-03-28 Well Log Performed
1993-03-28 Well Mode changed to Drilled and Cased
1993-03-29 Well Log Performed
1993-03-30 Drill Stem Test Performed
1993-03-31 Perforation Treatment Performed - Cement Plug
1993-03-31 Perforation Treatment Performed - Open-Hole Completion
1993-03-31 Plug Back Performed
1993-03-31 Well Log Performed
1993-04-02 Rig Released
1993-04-07 Well Mode changed to Abandoned Zone
1994-02-01 Perforation Treatment Performed - Jet Perforation
1994-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-30 Perforation Treatment Performed - Chemical Squeeze
2003-09-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-08-20 Open Hole/Barefoot Completion 2596.00 2602.10 0
1988-04-22 Acid Treatment 2568.90 2570.70 0
1988-04-23 Perforation 2570.70 2572.20 13
1988-04-23 Acid Treatment 2568.90 2572.20 0
1993-03-09 Cement Squeeze 2568.90 2578.50 0
1993-03-28 Open Hole/Barefoot Completion 2596.00 3032.00 0
1993-03-31 Cement Plug 3000.00 3032.00 0
1993-03-31 Cement Plug 2840.00 2910.00 0
1993-03-31 Cement Plug 2635.00 2680.00 0
1993-03-31 Open Hole/Barefoot Completion 2596.00 2635.00 0
1994-02-01 Perforation 2565.20 2567.20 13
1961-07-15 Open Hole/Barefoot Completion 2596.00 2623.40 0
1994-02-03 Acid Treatment 2565.20 2567.20 0
1994-05-30 Chemical Squeeze 2565.20 2567.20 0
1984-09-10 Perforation 2577.00 2578.50 13
1984-09-12 Acid Treatment 2577.00 2578.50 0
1988-04-14 Packing Device Capped w/Cement 2575.00 2592.00 0
1988-04-15 Perforation 2565.80 2565.80 13
1988-04-18 Acid Treatment 2565.80 2565.80 0
1988-04-20 Cement Squeeze 2565.80 2565.80 0
1988-04-21 Perforation 2568.90 2570.70 13

For data sources see[4]



References