X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355011003000

Well Details

Well ID: 0355011003000
Loading map...
Location: 00/03-10-035-01W5/0
Location Alias: 00/03-10-35-01 W5M
Location Alias 2: 00/03-10-035-01 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 10
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 3-10-35-1
Operator Name: Enhance Energy Inc.
License Number: 0014275
License Date: 1957-11-18
License Status: Suspension
Spud Date: 1957-11-22
Final Drill Date: 1958-01-10
Well Total Depth: 2610.30 m
Surface Hole Latitude: 51.986180
Surface Hole Longitude: -114.064161

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-11-18 Obtained License
1958-01-05 Liner Casing Operation Performed
1958-01-10 Finished Drilling
1958-01-10 Well Mode changed to Drilled and Cased
1958-01-16 Well Began Production
1958-01-16 Well Fluid changed to Crude Oil
1958-01-16 Well Mode changed to Flowing
1958-01-20 Perforation Treatment Performed - Jet Perforation
1975-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-29 Well Log Performed
1984-04-24 Well Log Performed
1984-04-26 Perforation Treatment Performed - Cement Squeeze
1984-04-30 Perforation Treatment Performed - Jet Perforation
1985-07-08 Well Fluid changed to Crude Oil
1985-07-08 Well Mode changed to Pumping
2012-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-12-15 Well Log Performed
2012-12-16 Well Fluid changed to Crude Oil
2012-12-16 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-01-20 Perforation 2594.50 2600.60 13
1975-11-18 Acid Treatment 2594.50 2600.60 0
1984-04-26 Cement Squeeze 2594.50 2600.60 0
1984-04-30 Perforation 2573.00 2577.00 13
1984-04-30 Perforation 2579.20 2581.00 13
2012-12-15 Packing Device Capped w/Cement 2235.90 2243.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1168 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 5025 0.0 0.0 0.0
1970 5164 0.0 0.0 0.0
1971 4698 0.0 0.0 0.0
1972 7344 0.0 0.0 0.0
1973 5345 0.0 0.0 0.0
1974 4263 0.0 0.0 0.0
1975 3789 0.0 0.0 0.0
1976 5890 0.0 0.0 0.0
1977 6009 0.0 0.0 0.0
1978 5779 0.0 0.0 0.0
1979 8621 0.0 0.0 0.0
1980 7636 0.0 0.0 0.0
1981 3438 0.0 0.0 0.0
1984 5119 0.0 0.0 0.0
1985 5551 0.0 0.0 0.0
1986 7411 0.0 0.0 0.0
1987 8301 0.0 0.0 0.0
1988 5890 0.0 0.0 0.0
1989 5208 0.0 0.0 0.0
1990 5860 0.0 0.0 0.0
1991 6406 0.0 0.0 0.0
1992 7810 0.0 0.0 0.0
1993 6454 0.0 0.0 0.0
1994 6126 0.0 0.0 0.0
1995 7892 0.0 0.0 0.0
1996 7851 0.0 0.0 0.0
1997 7356 0.0 0.0 0.0
1998 7285 0.0 0.0 0.0
1999 7865 0.0 0.0 0.0
2000 7301 0.0 0.0 0.0
2001 7743 0.0 0.0 0.0
2002 6268 0.0 0.0 0.0
2003 8300 0.0 0.0 0.0
2004 4053 0.0 0.0 0.0
2005 7318 0.0 0.0 0.0
2006 7602 0.0 0.0 0.0
2007 8647 0.0 0.0 0.0
2008 4504 0.0 0.0 0.0
2009 5586 0.0 0.0 0.0
2010 6625 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References