X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355010403000

Well Details

Well ID: 0355010403000
Loading map...
Location: 00/03-04-035-01W5/0
Location Alias: 00/03-04-35-01 W5M
Location Alias 2: 00/03-04-035-01 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 04
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 3-4-35-1
Operator Name: Enhance Energy Inc.
License Number: 0014673
License Date: 1958-01-29
License Status: Suspension
Spud Date: 1958-02-08
Final Drill Date: 1958-03-30
Well Total Depth: 2625.50 m
Surface Hole Latitude: 51.972229
Surface Hole Longitude: -114.087076

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-01-29 Obtained License
1958-02-15 Lost Circulation Occurred
1958-02-19 Lost Circulation Occurred
1958-02-21 Lost Circulation Occurred
1958-03-22 Production Casing Operation Performed
1958-03-30 Finished Drilling
1958-03-30 Perforation Treatment Performed - Open-Hole Completion
1958-03-30 Well Mode changed to Drilled and Cased
1958-04-04 Well Began Production
1958-04-04 Well Fluid changed to Crude Oil
1958-04-04 Well Mode changed to Flowing
1985-11-04 Well Fluid changed to Crude Oil
1985-11-04 Well Mode changed to Pumping
1987-12-04 Well Log Performed
1987-12-07 Perforation Treatment Performed - Cement Squeeze
1987-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-08 Perforation Treatment Performed - Jet Perforation
1987-12-08 Well Log Performed
1999-10-31 Well Fluid changed to Crude Oil
1999-10-31 Well Mode changed to Suspended
1999-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-19 Plug Back Performed
1999-11-19 Well Fluid changed to Crude Oil
1999-11-19 Well Log Performed
1999-11-19 Well Mode changed to Abandoned Zone
2001-12-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-03-30 Open Hole/Barefoot Completion 2615.80 2625.50 0
1987-12-07 Cement Squeeze 2615.80 2625.50 0
1987-12-08 Perforation 2615.40 2618.40 13
1987-12-08 Acid Treatment 2615.40 2618.40 0
1999-11-19 Packing Device Capped w/Cement 2580.30 2588.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1985 5307 0.0 0.0 0.0
1986 5021 0.0 0.0 0.0
1987 6371 0.0 0.0 0.0
1988 6252 0.0 0.0 0.0
1989 6183 0.0 0.0 0.0
1990 6244 0.0 0.0 0.0
1991 5869 0.0 0.0 0.0
1992 7591 0.0 0.0 0.0
1993 7040 0.0 0.0 0.0
1994 8250 0.0 0.0 0.0
1995 7910 0.0 0.0 0.0
1996 8606 0.0 0.0 0.0
1997 6221 0.0 0.0 0.0
1998 440 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-02-15 Lost Circulation 1345.60 1345.60
1958-02-19 Lost Circulation 1883.00 1883.00
1958-02-21 Lost Circulation 1956.50 1956.50

For data sources see[6]

References