X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354272910002

Well Details

Well ID: 0354272910002
Loading map...
Location: 00/10-29-035-27W4/2
Location Alias: 00/10-29-35-27 W4M
Location Alias 2: 00/10-29-035-27 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 27
Section: 29
County/Municipality: Red Deer County
Well Name: CPC RESOURCES PENHOLD 10-29-35-27
Operator Name: Lynx Energy ULC
License Number: 0285319
License Date: 2003-04-01
License Status: Suspension
Spud Date: 2003-10-18
Final Drill Date: 2003-10-22
Well Total Depth: 1190.00 m
Surface Hole Latitude: 52.034273
Surface Hole Longitude: -113.824205

For data sources see[1][2]

Well History

Date Event
2003-04-01 Obtained License
2003-10-19 Surface Casing Operation Performed
2003-10-22 Finished Drilling
2003-10-22 Well Mode changed to Drilled and Cased
2003-10-23 Well Log Performed
2003-10-24 Production Casing Operation Performed
2003-10-24 Rig Released
2003-11-07 Well Log Performed
2003-11-16 Perforation Treatment Performed - Jet Perforation
2003-11-17 Perforation Treatment Performed - Jet Perforation
2003-11-18 Perforation Treatment Performed - Jet Perforation
2003-11-20 Perforation Treatment Performed - Jet Perforation
2003-11-21 Perforation Treatment Performed - Jet Perforation
2003-11-23 Perforation Treatment Performed - Jet Perforation
2003-11-24 Perforation Treatment Performed - Jet Perforation
2003-11-25 Perforation Treatment Performed - Jet Perforation
2003-11-26 Perforation Treatment Performed - Jet Perforation
2003-12-19 Perforation Treatment Performed - Jet Perforation
2004-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-07 Plug Back Performed
2004-01-14 Perforation Treatment Performed - Fractured
2005-07-11 Well Fluid changed to Coalbed Methane-Coals and Other
2005-07-11 Well Log Performed
2005-07-11 Well Mode changed to Testing
2007-08-04 Well Log Performed
2007-09-05 Well Log Performed
2008-07-14 Perforation Treatment Performed - Jet Perforation
2008-07-14 Perforation Treatment Performed - Remedial Casing
2008-11-27 Well Began Production
2008-11-27 Well Fluid changed to Coalbed Methane-Coals and Other
2008-11-27 Well Mode changed to Flowing
2012-01-06 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-06 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-11-16 Perforation 1131.00 1132.00 7
2003-12-19 Perforation 830.00 831.00 13
2003-12-19 Perforation 827.00 828.00 13
2003-12-19 Perforation 823.00 824.00 13
2003-12-19 Perforation 812.50 816.50 13
2003-12-19 Perforation 795.00 800.00 13
2003-12-19 Perforation 791.00 792.00 13
2003-12-19 Perforation 768.00 770.00 13
2003-12-19 Perforation 758.00 759.00 13
2003-12-19 Perforation 751.00 753.00 13
2003-12-19 Perforation 746.00 747.00 13
2003-11-17 Perforation 1123.00 1124.00 7
2003-12-19 Perforation 675.00 676.00 13
2003-12-19 Perforation 667.50 668.50 13
2003-12-19 Perforation 575.00 576.00 13
2003-12-19 Perforation 562.00 563.00 13
2003-12-19 Perforation 537.00 538.00 13
2003-12-19 Perforation 438.00 440.00 13
2003-12-19 Perforation 432.50 434.50 13
2003-12-19 Perforation 320.00 327.00 13
2003-12-19 Perforation 315.00 316.00 13
2003-12-19 Perforation 307.50 308.50 13
2003-11-18 Perforation 692.00 694.00 7
2004-01-07 Packing Device Capped w/Cement 1102.00 1110.00 0
2004-01-14 Fracture 308.00 831.00 0
2008-07-14 Perforation 155.00 155.50 17
2008-07-14 Remedial Casing Cementing 155.00 155.50 0
2003-11-20 Perforation 603.00 604.00 7
2003-11-21 Perforation 588.00 590.00 7
2003-11-23 Perforation 423.00 427.00 7
2003-11-24 Perforation 304.00 305.00 7
2003-11-25 Perforation 260.00 261.00 7
2003-11-26 Perforation 247.00 249.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 24 0.0 0.0 0.0
2008 822 0.0 0.0 0.0
2009 1515 0.0 0.0 0.0
2010 744 0.0 0.0 0.0
2011 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-02-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References