X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354262307000

Well Details

Well ID: 0354262307000
Loading map...
Location: 00/07-23-035-26W4/0
Location Alias: 00/07-23-35-26 W4M
Location Alias 2: 00/07-23-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 23
County/Municipality: Red Deer County
Well Name: PINE CLIFF THREEHCK 7-23-35-26
Operator Name: Pine Cliff Energy Ltd.
License Number: 0159239
License Date: 1993-06-18
License Status: Issued
Spud Date: 1993-07-06
Final Drill Date: 1993-07-13
Well Total Depth: 1803.00 m
Surface Hole Latitude: 52.017266
Surface Hole Longitude: -113.609070

For data sources see[1][2]

Well History

Date Event
1993-06-18 Obtained License
1993-07-06 Well Log Performed
1993-07-07 Surface Casing Operation Performed
1993-07-13 Finished Drilling
1993-07-13 Well Log Performed
1993-07-13 Well Mode changed to Drilled and Cased
1993-07-14 Production Casing Operation Performed
1993-07-14 Rig Released
1993-07-20 Well Log Performed
1993-07-21 Perforation Treatment Performed - Open-Hole Completion
1993-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-14 Well Log Performed
1993-08-23 Perforation Treatment Performed - Cement Plug
1993-08-24 Perforation Treatment Performed - Open-Hole Completion
1993-11-01 Well Began Production
1993-11-01 Well Fluid changed to Gas
1993-11-01 Well Mode changed to Flowing
1999-09-23 Well Fluid changed to Gas
1999-09-23 Well Mode changed to Suspended
2000-03-03 Perforation Treatment Performed - Open-Hole Completion
2000-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-11 Well Fluid changed to Gas
2000-06-11 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-21 Open Hole/Barefoot Completion 1757.00 1803.00 0
1993-07-22 Acid Treatment 1757.00 1803.00 0
1993-08-23 Cement Plug 1782.30 1803.00 0
1993-08-24 Open Hole/Barefoot Completion 1757.00 1782.30 0
2000-03-03 Open Hole/Barefoot Completion 1775.70 1803.00 0
2000-03-05 Acid Treatment 1784.00 1803.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1254 0.0 0.0 0.0
1994 6332 0.0 0.0 0.0
1995 8105 0.0 0.0 0.0
1996 8190 0.0 0.0 0.0
1997 8377 0.0 0.0 0.0
1998 8750 0.0 0.0 0.0
1999 6377 0.0 0.0 0.0
2000 4977 0.0 0.0 0.0
2001 8673 0.0 0.0 0.0
2002 8400 0.0 0.0 0.0
2003 8494 0.0 0.0 0.0
2004 8734 0.0 0.0 0.0
2005 8567 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8681 0.0 0.0 0.0
2009 8448 0.0 0.0 0.0
2010 8687 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 4876 0.0 0.0 0.0
2015 8686 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References