X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354261310020

Well Details

Well ID: 0354261310020
Loading map...
Location: 02/10-13-035-26W4/0
Location Alias: 02/10-13-35-26 W4M
Location Alias 2: 02/10-13-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 13
County/Municipality: Red Deer County
Well Name: PINE CLIFF THREEHCK 10-13-35-26
Operator Name: Pine Cliff Energy Ltd.
License Number: 0145512
License Date: 1990-09-21
License Status: Issued
Spud Date: 1990-10-03
Final Drill Date: 1990-10-11
Well Total Depth: 1560.00 m
Surface Hole Latitude: 52.007038
Surface Hole Longitude: -113.584908

For data sources see[1][2]

Well History

Date Event
1990-09-21 Obtained License
1990-10-04 Lost Circulation Occurred
1990-10-05 Surface Casing Operation Performed
1990-10-08 Drill Stem Test Performed
1990-10-11 Finished Drilling
1990-10-11 Well Mode changed to Drilled and Cased
1990-10-12 Drill Stem Test Performed
1990-10-12 Well Log Performed
1990-10-14 Production Casing Operation Performed
1990-10-14 Rig Released
1990-10-22 Well Log Performed
1990-10-23 Perforation Treatment Performed - Jet Perforation
1990-10-25 Perforation Treatment Performed - Fractured
1990-11-01 Well Began Production
1990-11-01 Well Fluid changed to Gas
1990-11-01 Well Mode changed to Flowing
1990-11-09 Perforation Treatment Performed - Cement Squeeze
1990-11-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1990-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-15 Plug Back Performed
1990-11-15 Well Log Performed
1990-11-16 Perforation Treatment Performed - Jet Perforation
1991-01-25 Perforation Treatment Performed - Fractured
1998-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-12 Perforation Treatment Performed - Jet Perforation
1998-09-12 Plug Back Performed
1998-09-12 Well Fluid changed to Gas
1998-09-12 Well Log Performed
1998-09-12 Well Mode changed to Abandoned Zone
1998-09-15 Perforation Treatment Performed - Fractured
1998-09-17 Well Log Performed
1998-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-18 Perforation Treatment Performed - Jet Perforation
1998-09-18 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-10-23 Perforation 1516.00 1519.00 13
1998-09-12 Perforation 883.00 887.50 18
1998-09-15 Fracture 883.00 887.50 0
1998-09-18 Packing Device Capped w/Cement 867.00 875.00 0
1998-09-18 Perforation 697.00 701.00 18
1990-10-25 Fracture 1516.00 1519.00 0
1990-11-09 Cement Squeeze 1516.00 1519.00 0
1990-11-12 Hydra Jet Perforation 1516.50 1519.00 0
1990-11-13 Acid Treatment 1516.50 1519.00 0
1990-11-15 Packing Device Capped w/Cement 1492.00 1500.00 0
1990-11-16 Perforation 962.00 968.00 13
1991-01-25 Fracture 962.00 968.00 0
1998-09-12 Packing Device Capped w/Cement 944.00 952.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 210 0.0 0.0 0.0
1991 7873 0.0 0.0 0.0
1992 8622 0.0 0.0 0.0
1993 8571 0.0 0.0 0.0
1994 8296 0.0 0.0 0.0
1995 8384 0.0 0.0 0.0
1996 8482 0.0 0.0 0.0
1997 8468 0.0 0.0 0.0
1998 5805 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-10-04 Lost Circulation 42.00 42.00

For data sources see[6]

References