X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354261110000

Well Details

Well ID: 0354261110000
Loading map...
Location: 00/10-11-035-26W4/0
Location Alias: 00/10-11-35-26 W4M
Location Alias 2: 00/10-11-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 11
County/Municipality: Red Deer County
Well Name: PINE CLIFF THREEHCK 10-11-35-26
Operator Name: Pine Cliff Energy Ltd.
License Number: 0063810
License Date: 1977-05-12
License Status: Issued
Spud Date: 1977-05-28
Final Drill Date: 1977-06-08
Well Total Depth: 1821.20 m
Surface Hole Latitude: 51.992856
Surface Hole Longitude: -113.607210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-12 Obtained License
1977-05-29 Lost Circulation Occurred
1977-06-08 Finished Drilling
1977-06-09 Drill Stem Test Performed
1977-06-10 Production Casing Operation Performed
1977-06-27 Perforation Treatment Performed - Jet Perforation
1977-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-22 Well Mode changed to Drilled and Cased
1977-11-14 Well Began Production
1977-11-14 Well Fluid changed to Gas
1977-11-14 Well Mode changed to Flowing
1979-11-01 Well Fluid changed to Gas
1979-11-01 Well Mode changed to Suspended
1990-10-29 Well Fluid changed to Gas
1990-10-29 Well Mode changed to Flowing
2008-11-07 Well Fluid changed to Gas
2008-11-07 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-27 Perforation 1768.80 1772.70 7
1977-06-27 Perforation 1780.60 1785.20 7
1977-06-27 Perforation 1785.20 1789.80 7
1977-06-27 Perforation 1791.60 1792.80 7
1977-06-28 Acid Treatment 1768.80 1792.80 0
1977-07-11 Acid Treatment 1768.80 1792.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 184 0.0 0.0 0.0
1978 1778 0.0 0.0 0.0
1979 3035 0.0 0.0 0.0
1990 1010 0.0 0.0 0.0
1991 1522 0.0 0.0 0.0
1992 3519 0.0 0.0 0.0
1993 5093 0.0 0.0 0.0
1994 7593 0.0 0.0 0.0
1995 4853 0.0 0.0 0.0
1996 6440 0.0 0.0 0.0
1997 2447 0.0 0.0 0.0
1998 1 0.0 0.0 0.0
2000 24 0.0 0.0 0.0
2001 7221 0.0 0.0 0.0
2002 8709 0.0 0.0 0.0
2003 8261 0.0 0.0 0.0
2004 8635 0.0 0.0 0.0
2005 8216 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8358 0.0 0.0 0.0
2009 8208 0.0 0.0 0.0
2010 8750 0.0 0.0 0.0
2011 8712 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-05-29 Lost Circulation 178.00 204.00

For data sources see[6]

References