If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354260906020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.988399,"lon":-113.663498,"icon":""}]} |
Location: 02/06-09-035-26W4/0 | |
Location Alias: 02/06-09-35-26 W4M | |
Location Alias 2: 02/06-09-035-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Red Deer County | |
Well Name: CNRL WIM 6-9-35-26 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0401416 | |
License Date: 2008-09-25 | |
License Status: Issued | |
Spud Date: 2008-11-30 | |
Final Drill Date: 2008-12-01 | |
Well Total Depth: 818.00 m | |
Surface Hole Latitude: 51.988399 | |
Surface Hole Longitude: -113.663498 |
Date | Event |
---|---|
2008-09-25 | Obtained License |
2008-12-01 | Finished Drilling |
2008-12-01 | Surface Casing Operation Performed |
2008-12-01 | Well Mode changed to Drilled and Cased |
2008-12-02 | Production Casing Operation Performed |
2008-12-02 | Rig Released |
2008-12-02 | Well Log Performed |
2008-12-17 | Perforation Treatment Performed - Jet Perforation |
2009-01-09 | Perforation Treatment Performed - Fractured |
2009-01-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-01-10 | Well Mode changed to Testing |
2009-02-12 | Well Began Production |
2009-02-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-12-17 | Perforation | 371.00 | 371.80 | 7 |
2008-12-17 | Perforation | 520.20 | 521.20 | 7 |
2008-12-17 | Perforation | 529.00 | 530.00 | 7 |
2008-12-17 | Perforation | 537.00 | 538.00 | 7 |
2008-12-17 | Perforation | 543.30 | 544.10 | 7 |
2008-12-17 | Perforation | 602.90 | 603.70 | 7 |
2008-12-17 | Perforation | 622.20 | 623.00 | 7 |
2008-12-17 | Perforation | 634.20 | 635.00 | 7 |
2008-12-17 | Perforation | 653.00 | 655.80 | 7 |
2008-12-17 | Perforation | 673.80 | 674.80 | 7 |
2008-12-17 | Perforation | 678.70 | 679.40 | 7 |
2008-12-17 | Perforation | 375.80 | 376.80 | 7 |
2008-12-17 | Perforation | 680.80 | 682.30 | 7 |
2008-12-17 | Perforation | 692.20 | 695.60 | 7 |
2008-12-17 | Perforation | 699.70 | 700.60 | 7 |
2008-12-17 | Perforation | 708.90 | 709.70 | 7 |
2008-12-17 | Perforation | 711.50 | 712.20 | 7 |
2008-12-17 | Perforation | 719.20 | 720.00 | 7 |
2008-12-17 | Perforation | 732.40 | 733.80 | 7 |
2008-12-17 | Perforation | 737.30 | 739.00 | 7 |
2008-12-17 | Perforation | 741.70 | 742.70 | 7 |
2008-12-17 | Perforation | 747.80 | 748.60 | 7 |
2008-12-17 | Perforation | 383.80 | 384.50 | 7 |
2008-12-17 | Perforation | 753.80 | 754.60 | 7 |
2008-12-17 | Perforation | 768.20 | 769.00 | 7 |
2008-12-17 | Perforation | 769.90 | 770.70 | 7 |
2009-01-09 | Fracture | 371.00 | 770.70 | 0 |
2008-12-17 | Perforation | 451.00 | 451.70 | 7 |
2008-12-17 | Perforation | 452.40 | 454.00 | 7 |
2008-12-17 | Perforation | 477.20 | 478.00 | 7 |
2008-12-17 | Perforation | 490.00 | 490.70 | 7 |
2008-12-17 | Perforation | 496.00 | 497.00 | 7 |
2008-12-17 | Perforation | 505.70 | 508.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 7742 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8735 | 0.0 | 0.0 | 0.0 |
2012 | 8735 | 0.0 | 0.0 | 0.0 |
2013 | 8735 | 0.0 | 0.0 | 0.0 |
2014 | 8735 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]